Show on map
Hardee Power Station - Midulla Generating Station 230 kV — Transmission lineMidulla Generating Station — Postponed · Oil · FL · 555 MW · 0.1 mi awayPolk — Postponed · Gas, combined cycle · FL · 1,858.8 MW · 6.3 mi awayBrewster Solar — Under construction · Solar · FL · 40 MW · 6.9 mi awayUnknown — Postponed · Oil · FL · 1,560 MW · 7.1 mi awayTide Bay — Postponed · Solar · FL · 74.9 MW · 9.7 mi awayHines Energy Complex — Postponed · Gas, combined cycle · FL · 1,034 MW · 11.6 mi away
  • Wind & solar
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Hardee Power Station - Midulla Generating Station 230 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-FL
Owner (as stated)
Duke Energy Florida

Details

Who’s behind it

Owner
Duke Energy Florida

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
0
Substations at the ends (as the source names them)
Hardee Power Station to Midulla Generating Station
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itduke energy florida
HIFLD line ID143178
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Midulla Generating Station Postponed Oil 0.1 mi 555
Polk Postponed Gas, combined cycle 6.3 mi 1,858.8
Brewster Solar Under construction Solar 6.9 mi 40
Unknown Postponed Oil 7.1 mi 1,560
Tide Bay Postponed Solar 9.7 mi 74.9
Hines Energy Complex Postponed Gas, combined cycle 11.6 mi 1,034

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution