Show on map
HEB00020 — Power plant · Gas, reciprocating engine · Texas Microgrid, LLCHockley — Under construction · Storage · TX · 9.9 MW · 6.5 mi awaySERVERFARM - HOCKLEY 2 — Under construction · Large load · TX · 7.3 mi awaySMT DC Houston III (Hockley data centre) — Filed · Large load · TX · 9.8 mi awayJohn Paul Jones — Postponed · Gas, reciprocating engine · TX · 18.7 MW · 10.7 mi awaySERVERFARM LONGHORN — Under construction · Large load · TX · 10.8 mi awaySMT DC Houston 1 (Tomball data centre) — Filed · Large load · TX · 11.8 mi away
  • Combustion
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Gas, reciprocating engine

Key facts

Power plant · Gas, reciprocating engineran 2% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2018
Net generation, 2025
195 MWh
Grid
138 kV to CenterPoint Energy (ERCO)
Location
Harris County, Texas
Operated by
Texas Microgrid, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2021 to 2025
Fuel burned MMBtu by year, 2021 to 2025
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
Age
8 years since 2018
Unused energy
10 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
16,385 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
138
Transmission owner
CenterPoint Energy
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 20253,195
Capacity factor, 20250.019
Heat rate (Btu/kWh), 202516,384.6
Net generation (MWh), 2025195
Balancing authority codeERCO

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Hockley Under construction Storage 6.5 mi 9.9
SERVERFARM - HOCKLEY 2 Under construction Large load 7.3 mi
SMT DC Houston III (Hockley data centre) Filed Large load 9.8 mi
John Paul Jones Postponed Gas, reciprocating engine 10.7 mi 18.7
SERVERFARM LONGHORN Under construction Large load 10.8 mi
SMT DC Houston 1 (Tomball data centre) Filed Large load 11.8 mi

Sources EIA-860M · EPA ICIS-NPDES · FAA OE/AAA

Sources

Attribution