Show on map
HEB00070 — Power plant · Gas, reciprocating engine · Texas Microgrid, LLCABILENE DATA CENTER PH3 BLDGS 9-10 — Under construction · Large load · TX · 4.2 mi awayLONGHORN DATA CENTER — Built · Large load · TX · 5.4 mi awaySummerhill BESS — Announced · Storage · TX · 143 MW · 5.9 mi awayChimney Rock BESS — Studied · Storage · TX · 156 MW · 6.1 mi away1300 luffer crane (Abilene data centre) — Filed · Large load · TX · 14.0 mi away
  • Combustion
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Gas, reciprocating engine

Key facts

Power plant · Gas, reciprocating engineran 2% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2018
Net generation, 2025
255 MWh
Grid
138 kV to AEP Texas North Company (ERCO)
Location
Taylor County, Texas
Operated by
Texas Microgrid, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2021 to 2025
Fuel burned MMBtu by year, 2021 to 2025
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
Age
8 years since 2018
Unused energy
10 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
14,172 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
138
Transmission owner
AEP Texas North Company
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 20253,614
Capacity factor, 20250.024
Heat rate (Btu/kWh), 202514,172.5
Net generation (MWh), 2025255
Balancing authority codeERCO

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
ABILENE DATA CENTER PH3 BLDGS 9-10 Under construction Large load 4.2 mi
LONGHORN DATA CENTER Built Large load 5.4 mi
Summerhill BESS Announced Storage 5.9 mi 143
Chimney Rock BESS Studied Storage 6.1 mi 156
1300 luffer crane (Abilene data centre) Filed Large load 14.0 mi

Sources EPA ICIS-NPDES · FAA OE/AAA · EPA ICIS-Air · ERCOT · EIA-860M

Sources

Attribution