HEB00182 — Power plant · Gas, reciprocating engine · Texas Microgrid, LLCAUS04 DATA CENTER — Under construction · Large load · TX · 4.6 km awayTEMPLE 5MW DATA CENTER — Built · Large load · TX · 6.2 km awayCC2500 - AUS01 Temple TX (Temple data centre) — Filed · Large load · TX · 7.6 km awayAUS01 (Temple data centre) — Filed · Large load · TX · 8.5 km awayAUS02 DATA CENTER — Under construction · Large load · TX · 8.9 km awayLimewood Bell Renewables Solar — Under construction · Solar + storage · TX · 254.6 MW · 12.2 km awayChillingham Solar — Built · Solar · TX · 352.4 MW · 12.7 km awayBig Elm Storage — Postponed · Storage · TX · 100 MW · 16.5 km awayHermes Storage BESS — Under construction · Solar + storage · TX · 200.8 MW · 23.0 km away
  • Combustion
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Gas, reciprocating engine

Key facts

Power plant · Gas, reciprocating engineran 2% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2018
Net generation, 2025
236 MWh
Grid
138 kV to Oncor Electric Delivery Company LLC (ERCO)
Location
Bell County, Texas
Operated by
Texas Microgrid, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2021 to 2025
Fuel burned MMBtu by year, 2021 to 2025
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
Age
8 years since 2018
Unused energy
10 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
14,136 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
138
Transmission owner
Oncor Electric Delivery Company LLC
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 20253,336
Capacity factor, 20250.022
Heat rate (Btu/kWh), 202514,135.6
Net generation (MWh), 2025236
Balancing authority codeERCO

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
AUS04 DATA CENTER Under construction Large load 4.6 km
TEMPLE 5MW DATA CENTER Built Large load 6.2 km
CC2500 - AUS01 Temple TX (Temple data centre) Filed Large load 7.6 km
AUS01 (Temple data centre) Filed Large load 8.5 km
AUS02 DATA CENTER Under construction Large load 8.9 km
Limewood Bell Renewables Solar Under construction Solar + storage 12.2 km 254.6
Chillingham Solar Built Solar 12.7 km 352.4
Big Elm Storage Postponed Storage 16.5 km 100
Hermes Storage BESS Under construction Solar + storage 23.0 km 200.8

Sources EPA ICIS-NPDES · FAA OE/AAA · ERCOT · EIA-860M

Sources

  • EPA ICIS-NPDESOpen license · retrieved Nov 8, 2026
  • FAA OE/AAAOpen license · retrieved Nov 9, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution