Show on map
HEB00591 — Power plant · Gas, reciprocating engine · Texas Microgrid, LLCBuilding B (Round Rock data centre) — Large load · TX · 3.4 km awaySABEY DATA CENTER AUSTIN — Large load · TX · 3.5 km awayAUSTIN DATA CENTER 2 — Large load · TX · 5.3 km awayHUTTO DATA CENTER CAMPUS — Large load · TX · 12.9 km awayPecan Crossing Building 2 (Pflugerville data centre) — Large load · TX · 13.8 km away
  • Combustion
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Gas, reciprocating engine

Key facts

Power plant · Gas, reciprocating engineran 2% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2018
Net generation, 2025
300 MWh
Grid
138 kV to Oncor Electric Delivery Company LLC (ERCO)
Location
Williamson County, Texas
Operated by
Texas Microgrid, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2022 to 2025
Fuel burned MMBtu by year, 2022 to 2025
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
Age
8 years since 2018
Unused energy
14 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
14,127 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
138
Transmission owner
Oncor Electric Delivery Company LLC
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 20254,238
Capacity factor, 20250.021
Heat rate (Btu/kWh), 202514,126.7
Net generation (MWh), 2025300
Balancing authority codeERCO

Timeline

  • In service · EIA-860M

Sources

3 sources

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Building B (Round Rock data centre) Filed Large load 3.4 km
SABEY DATA CENTER AUSTIN Under construction Large load 3.5 km
AUSTIN DATA CENTER 2 Under construction Large load 5.3 km
HUTTO DATA CENTER CAMPUS Built Large load 12.9 km
Pecan Crossing Building 2 (Pflugerville data centre) Filed Large load 13.8 km