Show on map
Highland Park Borough Solar — Power plant · Storage · Public Service Elec & Gas CoMilltown Onsite BESS — Under construction · Storage · NJ · 13.2 MW · 3.1 mi awayBARCLAYS CAPITAL DATA CENTER — Built · Large load · NJ · 4.5 mi awayEVOQUE DATA CENTER SOLUTIONS - PNJ1 — Built · Large load · NJ · 4.6 mi awayMiddlesex Energy Center LLC — Postponed · Gas, combined cycle · NJ · 570 MW · 4.8 mi awayGateway Energy Center, LLC — Postponed · Gas, combined cycle · NJ · 440 MW · 5.4 mi awayNJ 1 DATA CENTER — Built · Large load · NJ · 5.4 mi awayPrologis - SLCNJ001 - Community Solar — Under construction · Solar · NJ · 3.2 MW · 6.4 mi awayFIDESSA — Built · Large load · NJ · 7.1 mi awayBPL NJ - Belmont — Under construction · Solar · NJ · 1.8 MW · 7.1 mi awayMORGAN STANLEY DATA CENTER — Built · Large load · NJ · 7.3 mi awayBLOOMBERG DATA CENTER — Built · Large load · NJ · 9.9 mi awayBARCLAYS CAPITAL DATA CENTER — Built · Large load · NJ · 12.3 mi awayElevate Arthur Kill — Under construction · Storage · NY · 15.1 MW · 13.2 mi awayPROPOSED DATA CENTER DEVELOPMENT — Under construction · Large load · NJ · 13.3 mi awaySwiftsure — Postponed · Storage · NY · 121 MW · 14.0 mi awayCoreweave — Under construction · Large load · NJ · 14.4 mi away
  • Wind & solar
  • Storage
  • Loads
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Highland Park Borough Solar

Power plant · Storage

Key facts

Power plant · Storageran 6% of 2025 Retiring
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2019
Net generation, 2025
550 MWh
Grid
4 kV to Public Service Elec & Gas Co (PJM)
Location
Middlesex County, New Jersey
Operated by
Public Service Elec & Gas CoSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2021 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Storage source: “Batteries”
Age
7 years since 2019
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Fuel burned (MMBtu), 20252,122
Capacity factor, 20250.057
Net generation (MWh), 2025550
Balancing authority codePJM

Retirement

EIA-860M September 2026StatusAt least half of the plant's in-service nameplate capacity is scheduled to retire, on dates its owner has reported to EIA. As of EIA-860M for September 2026.
Next scheduled retirement
December 2039
Capacity scheduled to retire
1.1 MW
Generators scheduled to retire
2
Share of in-service capacity scheduled
100%
Capacity still in service
1.1 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
HIGHSolar Photovoltaic0.5 MWScheduled to retireDecember 2039
HPBABatteries0.6 MWScheduled to retireDecember 2039
By technology
Nameplate capacity retired or scheduled to retire, by technology
TechnologyRetiredScheduled to retire
Batteries0.6 MW
Solar Photovoltaic0.5 MW

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
4 kV
Transmission or distribution system owner
Public Service Elec & Gas Co
Balancing authority
PJM Interconnection, LLC
NERC region
RFC
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units HIGH, HPBA scheduled to retire, 1.1 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Milltown Onsite BESS Under construction Storage 3.1 mi 13.2
BARCLAYS CAPITAL DATA CENTER Built Large load 4.5 mi
EVOQUE DATA CENTER SOLUTIONS - PNJ1 Built Large load 4.6 mi
Middlesex Energy Center LLC Postponed Gas, combined cycle 4.8 mi 570
Gateway Energy Center, LLC Postponed Gas, combined cycle 5.4 mi 440
NJ 1 DATA CENTER Built Large load 5.4 mi
Prologis - SLCNJ001 - Community Solar Under construction Solar 6.4 mi 3.2
FIDESSA Built Large load 7.1 mi
BPL NJ - Belmont Under construction Solar 7.1 mi 1.8
MORGAN STANLEY DATA CENTER Built Large load 7.3 mi
BLOOMBERG DATA CENTER Built Large load 9.9 mi
BARCLAYS CAPITAL DATA CENTER Built Large load 12.3 mi
Elevate Arthur Kill Under construction Storage 13.2 mi 15.1
PROPOSED DATA CENTER DEVELOPMENT Under construction Large load 13.3 mi
Swiftsure Postponed Storage 14.0 mi 121
Coreweave Under construction Large load 14.4 mi

Sources EIA-860M · EPA ICIS-Air · EPA ICIS-NPDES · FAA OE/AAA

Sources

Attribution