Show on map
Hillsborough County Resource Recovery — Power plant · Waste to energy · Hillsborough County - (FL)H L Culbreath Bayside Power Station — Postponed · Gas, combustion turbine · FL · 503.8 MW · 6.0 mi awayTampa Electric Co NA 2 — Postponed · Gas, combustion turbine · FL · 982 MW · 6.0 mi awayTampa Electric Co NA 3 — Postponed · Gas, combustion turbine · FL · 99 MW · 11.5 mi awayBig Bend III Battery Storage — Permitted · Storage · FL · 75 MW · 11.7 mi awaySouth Tampa Energy Storage — Postponed · Storage · FL · 20 MW · 12.3 mi away
  • Storage
  • Bioenergy
  • In development
  • Operating
  • 10 · 100 · 1,000 MW

Hillsborough County Resource Recovery

Power plant · Waste to energy

Key facts

Power plant · Waste to energyran 49% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1987
Net generation, 2025
201,072 MWh
Grid
69 kV to Tampa Electric Co (TEC)
Location
Hillsborough County, Florida

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Gas
  • Biomass and waste

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Waste to energy source: “Municipal Solid Waste”
Age
39 years since 1987
Heat rate
28,388 Btu/kWh 2025
All 8 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Parents
Name
EQT Infrastructure VI Fund
Share pct
75
Gem entity id
E100001011072
Name
GIC Pvt Ltd
Share pct
25
Gem entity id
E100001010928
Unit ids
G100001054293, G100001055445
Location id
L100001047658
Eia plant ids
50858
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
69
Transmission owner
Tampa Electric Co
Balancing authority code
TEC
Balancing authority name
Tampa Electric Company
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110009078327
Subparts reported
C
NAICS code
562213
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1005920
Fuel burned (MMBtu), 20255,707,945
Capacity factor, 20250.488
Heat rate (Btu/kWh), 202528,387.6
Net generation (MWh), 2025201,072.0
Balancing authority codeTEC

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Hillsborough County - (FL) Operator EIA-860M
HILLSBOROUGH COUNTY PUBLIC UTILITIES DEPARTMENT Owner 100.0% Dec 31, 2023 EPA GHGRP

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
H L Culbreath Bayside Power Station Postponed Gas, combustion turbine 6.0 mi 503.8
Tampa Electric Co NA 2 Postponed Gas, combustion turbine 6.0 mi 982
Tampa Electric Co NA 3 Postponed Gas, combustion turbine 11.5 mi 99
Big Bend III Battery Storage Permitted Storage 11.7 mi 75
South Tampa Energy Storage Postponed Storage 12.3 mi 20

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution