HMDC Kingsland Landfill
- Combustion
- Wind & solar
- Storage
- Bioenergy
- Loads
- In development
- Under construction
- Operating
- Retired
- Size not stated
- 10 · 100 · 1,000 MW
Map
- Combustion
- Wind & solar
- Storage
- Bioenergy
- Loads
- In development
- Under construction
- Operating
- Retired
- Size not stated
HMDC Kingsland Landfill: location and 42 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
HMDC Kingsland Landfill
Power plant · Biomass
Key facts
Power plant · Biomassran 4% of 2010 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1999
- Net generation, 2010
- 855 MWh
- Location
- BERGEN County, New Jersey
- Operated by
- Energy Equipment
Output
- Biomass and waste
Details
Who’s behind it
Interested in this project?
- Technology
- Biomass source: “Landfill Gas”
- Age
- 27 years since 1999
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| EPA greenhouse gas reporting (GHGRP) |
|
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- December 2011
- Capacity retired
- 2.7 MW
- Generators retired
- 3
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| UNT1 | Landfill Gas | 0.9 MW | Retired | December 2011 |
| UNT2 | Landfill Gas | 0.9 MW | Retired | December 2011 |
| UNT3 | Landfill Gas | 0.9 MW | Retired | December 2011 |
Grid
Not in EIA-860Grid fieldsEIA-860 states no grid voltage or transmission owner for this plant: its annual file lists plants with a generator in the report year, so a plant that retired earlier is not in it.Transmission lines within 15 mi (10)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| New Jersey Meadowlands Commission | Owner | 100.0% | Dec 31, 2023 | EPA GHGRP |
| Energy Equipment | Operator | EIA-860M |
Timeline
- Stated Units UNT1, UNT2, UNT3 scheduled to retire, 2.7 MW · EIA-860M
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · LBNL · EIA · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| EQUINIX LLC Built | Large load | 2.4 mi | |
| EQUINIX Built | Large load | 2.6 mi | |
| CORESITE NY4 DATA CENTER Under construction | Large load | 2.8 mi | |
| CLIFTON DATA CENTER Built | Large load | 3.2 mi | |
| NJ TRANSITGRID Postponed | Gas, combustion turbine | 3.3 mi | 136.1 |
| RAR DEVELOPMENT ASSOCIATES × 2 units Built | Large load | 4.5 mi | |
| CYXTERA - NJ2X Built | Large load | 5.0 mi | |
| CDIL DATA CENTRE USA LLC Built | Large load | 7.5 mi | |
| AB Newark Solar Postponed | Solar | 7.6 mi | 5.6 |
| Elizabeth Metropolitan Logistics Center Under construction | Solar | 8.8 mi | 1.2 |
| Ravenswood Postponed | Battery storage | 9.1 mi | 316 |
| DLR Totowa Building A (Totowa data centre) Filed | Large load | 9.2 mi | |
| Prologis - SLNNJ036 - Community Solar Under construction | Solar | 9.3 mi | 1.6 |
| NISA Electric Generation Project × 2 units Permitted | Battery storage | 9.5 mi | 392.5 |
| Bayonne Energy Center Under construction | Battery storage | 9.6 mi | 49.8 |
| New York University Central Plant Under construction | Gas, combined cycle | 10.0 mi | 5.5 |
| BPL NJ - Union Distribution Center Under construction | Solar | 10.0 mi | 1.5 |
| Lincoln Medical and Mental Health Center Under construction | Oil | 10.1 mi | 1 |
| Gowanus Gas Turbines Generating Postponed | Gas, combustion turbine | 10.5 mi | 93 |
| Astoria Gas Turbines Postponed | Gas, combustion turbine | 10.9 mi | 431 |
| Coreweave Under construction | Large load | 11.6 mi | |
| Wintergreen C Clean Energy LLC Under construction | Battery storage | 11.8 mi | 4.9 |
| Wintergreen B Clean Energy LLC Under construction | Battery storage | 11.8 mi | 4.9 |
| Wintergreen D Clean Energy LLC Under construction | Battery storage | 11.8 mi | 4.9 |
| Wintergreen Clean Energy, LLC Under construction | Battery storage | 11.8 mi | 4.9 |
| Lobelia Clean Energy LLC Under construction | Battery storage | 12.2 mi | 4.9 |
| Lobelia 4452 Clean Energy LLC Under construction | Battery storage | 12.2 mi | 4.9 |
| Staten Island Energy Storage 1 LLC Postponed | Battery storage | 12.6 mi | 5 |
| Roseate Tern Clean Energy LLC Under construction | Battery storage | 13.0 mi | 3.3 |
| EASTGREEN INC AIG DATA CENTER Built | Large load | 13.0 mi | |
| Warbler Clean Energy LLC Under construction | Battery storage | 13.4 mi | 2.3 |
| Piping Plover Clean Energy, LLC Under construction | Battery storage | 13.4 mi | 2.3 |
| BARCLAYS CAPITAL DATA CENTER Built | Large load | 13.6 mi | |
| Blue Aster B Clean Energy LLC Under construction | Battery storage | 13.8 mi | 4.9 |
| Blue Aster Clean Energy LLC Under construction | Battery storage | 13.8 mi | 4.9 |
| Blue Aster C Clean Energy LLC Under construction | Battery storage | 13.8 mi | 4.9 |
| Swiftsure Postponed | Battery storage | 13.9 mi | 121 |
| Bensonhurst Energy Storage 1 LLC Under construction | Battery storage | 14.2 mi | 5 |
| Jamaica Community Energy, LLC Under construction | Battery storage | 14.4 mi | 4.9 |
| Elevate Arthur Kill Under construction | Battery storage | 14.6 mi | 15.1 |