Show on map
Hubbard Wind — Power plant · Wind · Hubbard Wind LLCWaco Solar II — Announced · Solar · TX · 200 MW · 7.9 km awayNEXUS DATA CENTER HUBBARD — Under construction · Large load · TX · 8.4 km awayNEXUS DATA CENTER - APEX PROJECT — Under construction · Large load · TX · 8.8 km awayPayne Battlecreek Solar — Contracted · Solar · TX · 85 MW · 11.1 km awayFindley PV and BESS — Studied · Solar + storage · TX · 102.1 MW · 15.3 km awayEytcheson Solar — Studied · Solar · TX · 76.4 MW · 16.3 km awayAsh Creek BESS — Announced · Storage · TX · 306 MW · 22.6 km awayPepper Solar Farm — Contracted · Solar · TX · 120.7 MW · 23.2 km away
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Hubbard Wind

Power plant · Wind

Key facts

Power plant · Windran 36% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2021
Net generation, 2025
956,337 MWh
Grid
345 kV to Lone Star Transmission (ERCO)
Location
Limestone County, Texas
Operated by
Hubbard Wind LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2021 to 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Wind source: “Onshore Wind Turbine”
Age
5 years since 2021
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000921365
Location id
L100000917221
Eia plant ids
65048
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
345
Transmission owner
Lone Star Transmission
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 20253,263,022
Capacity factor, 20250.364
Net generation (MWh), 2025956,337
Balancing authority codeERCO

Wind turbines

Turbines
108
Turbine capacity (MW)
301.4
Turbine models
10 GE Wind GE2.5-116 and 98 GE Wind GE2.82-127
Hub height (m)
89–90
Rotor diameter (m)
116–127
Year online
2021

Source U.S. Wind Turbine Database

Source

  • U.S. Wind Turbine DatabaseOpen license · retrieved Oct 25, 2026Map services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · U.S. Wind Turbine Database · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • U.S. Wind Turbine DatabaseOpen license · retrieved Oct 25, 2026Map services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Waco Solar II Announced Solar 7.9 km 200
NEXUS DATA CENTER HUBBARD Under construction Large load 8.4 km
NEXUS DATA CENTER - APEX PROJECT Under construction Large load 8.8 km
Payne Battlecreek Solar Contracted Solar 11.1 km 85
Findley PV and BESS Studied Solar + storage 15.3 km 102.1
Eytcheson Solar Studied Solar 16.3 km 76.4
Ash Creek BESS Announced Storage 22.6 km 306
Pepper Solar Farm Contracted Solar 23.2 km 120.7

Sources EIA-860M · EPA ICIS-NPDES · ERCOT

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EPA ICIS-NPDESOpen license · retrieved Nov 8, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026

Attribution