Show on map
IGS SBD1 — Power plant · Solar · Altus Power America Management, LLCSolar Photovoltaic Project #24 — Solar · CA · 4 MW · 1.1 km awayCA Bloomington 2551 S Lilac Avenue Micro — Solar + storage · CA · 3 MW · 1.9 km awayCA Riverside 2356 Fleetwood Dr. — Solar + storage · CA · 4 MW · 3.0 km awaySolar Photovoltaic Project #30 — Solar · CA · 1.5 MW · 4.7 km awaySolar Photovoltaic Project #25 — Solar · CA · 4.5 MW · 10.8 km awaySolar Photovoltaic Project #27 — Solar · CA · 1 MW · 10.8 km awaySolar Photovoltaic Project #17 — Solar · CA · 0.5 MW · 11.5 km awaySolar Photovoltaic Project #14 — Solar · CA · 1.5 MW · 11.7 km awaySolar Photovoltaic Project #28 — Solar · CA · 0.5 MW · 11.9 km awaySolar Photovoltaic Project #10 — Solar · CA · 0.5 MW · 12.8 km awaySolar Photovoltaic Project #04 — Solar · CA · 1.5 MW · 13.0 km awaySolar Photovoltaic Project #18 — Solar · CA · 0.5 MW · 13.1 km awaySolar Photovoltaic Project #19 — Solar · CA · 5 MW · 13.3 km awaySolar Photovoltaic Project #23 — Solar · CA · 0.5 MW · 13.3 km awaySunE Redlands — Solar · CA · 1.5 MW · 13.6 km awayOES Biogas Power — Biomass · CA · 2.6 MW · 15.4 km awaySolar Photovoltaic Project #21 — Solar · CA · 2.5 MW · 16.1 km awaySolar Photovoltaic Project #12 — Solar · CA · 0.5 MW · 16.3 km awaySolar Photovoltaic Project #08 — Solar · CA · 0.5 MW · 16.6 km awaySolar Photovoltaic Project #09 — Solar · CA · 0.5 MW · 17.2 km awayRoadhouse Energy Center — Storage · CA · 300 MW · 17.4 km awayRedlands DC 9 - sline609 — Solar + storage · CA · 5 MW · 17.4 km awaySolar Photovoltaic Project #31 — Solar · CA · 1 MW · 17.5 km awaySolar Photovoltaic Project #20 — Solar · CA · 3.5 MW · 17.6 km awayEnergy Center — Gas, combustion turbine · CA · 0.9 MW · 20.5 km awayAmazon - Moreno Valley — Solar · CA · 2.2 MW · 22.9 km away
  • Combustion
  • Wind & solar
  • Storage
  • Bioenergy
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Solar

Key facts

Power plant · Solarran 22% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2023
Net generation, 2025
4,905 MWh
Grid
0.5 kV to Southern California Edison Co (LDWP)
Location
San Bernardino County, California
Operated by
Altus Power America Management, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2023 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
3 years since 2023
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000838606
Location id
L100000832984
Eia plant ids
66035
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
0.500
Transmission owner
Southern California Edison Co
Balancing authority code
LDWP
Balancing authority name
Los Angeles Department of Water and Power
Fuel burned (MMBtu), 202516,735
Capacity factor, 20250.215
Net generation (MWh), 20254,905
Balancing authority codeLDWP

Solar array

Array area (acres)
8.5
AC capacity (MW)
2.6
DC capacity (MW)
3.4
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2023

Source USPVDB

Source

  • U.S. Large-Scale Solar Photovoltaic DatabaseOpen license · retrieved 25 Oct 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Solar Photovoltaic Project #24 Postponed Solar 1.1 km 4
CA Bloomington 2551 S Lilac Avenue Micro Under construction Solar + storage 1.9 km 3
CA Riverside 2356 Fleetwood Dr. Under construction Solar + storage 3.0 km 4
Solar Photovoltaic Project #30 Postponed Solar 4.7 km 1.5
Solar Photovoltaic Project #25 Postponed Solar 10.8 km 4.5
Solar Photovoltaic Project #27 Postponed Solar 10.8 km 1
Solar Photovoltaic Project #17 Postponed Solar 11.5 km 0.5
Solar Photovoltaic Project #14 Postponed Solar 11.7 km 1.5
Solar Photovoltaic Project #28 Postponed Solar 11.9 km 0.5
Solar Photovoltaic Project #10 Postponed Solar 12.8 km 0.5
Solar Photovoltaic Project #04 Postponed Solar 13.0 km 1.5
Solar Photovoltaic Project #18 Postponed Solar 13.1 km 0.5
Solar Photovoltaic Project #19 Postponed Solar 13.3 km 5
Solar Photovoltaic Project #23 Postponed Solar 13.3 km 0.5
SunE Redlands Postponed Solar 13.6 km 1.5
OES Biogas Power Under construction Biomass 15.4 km 2.6
Solar Photovoltaic Project #21 Postponed Solar 16.1 km 2.5
Solar Photovoltaic Project #12 Postponed Solar 16.3 km 0.5
Solar Photovoltaic Project #08 Postponed Solar 16.6 km 0.5
Solar Photovoltaic Project #09 Postponed Solar 17.2 km 0.5
Roadhouse Energy Center Contracted Storage 17.4 km 300
Redlands DC 9 - sline609 Under construction Solar + storage 17.4 km 5
Solar Photovoltaic Project #31 Postponed Solar 17.5 km 1
Solar Photovoltaic Project #20 Postponed Solar 17.6 km 3.5
Energy Center Announced Gas, combustion turbine 20.5 km 0.9
Amazon - Moreno Valley Postponed Solar 22.9 km 2.2

Sources EIA-860M · CAISO

Sources

Attribution