Show on map
Inks — Power plant · Hydro · LOWER COLORADO RIVER AUTHORITYRedSun PV and BESS — Solar + storage · TX · 166.6 MW · 18.5 km awayBackbone Creek BESS — Storage · TX · 124.1 MW · 23.6 km away
  • Clean firm
  • Wind & solar
  • Storage
  • In development
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Hydro

Key facts

Power plant · Hydroran 11% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1938
Net generation, 2025
14,321 MWh
Grid
69 kV to Lower Colorado River Authority (ERCO)
Location
Burnet County, Texas
Operated by
Lower Colorado River AuthoritySourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Hydro source: “Conventional Hydroelectric”
Age
88 years since 1938
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
69
Transmission owner
Lower Colorado River Authority
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 202548,864
Capacity factor, 20250.109
Net generation (MWh), 202514,321
Balancing authority codeERCO

Timeline

  • In service · EIA-860M

Sources

3 sources

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
RedSun PV and BESS Contracted Solar + storage 18.5 km 166.6
Backbone Creek BESS Built Storage 23.6 km 124.1

Sources ERCOT · EIA-860M

Sources

Attribution