- Clean firm
- Operating
- 10 · 100 · 1,000 MW
Map
- Clean firm
- Operating
Inks: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Inks
Power plant · Hydro
Key facts
Power plant · Hydroran 11% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1938
- Net generation, 2025
- 14,321 MWh
- Grid
- 69 kV to Lower Colorado River Authority (ERCO)
- Location
- Burnet County, Texas
- Operated by
- Lower Colorado River AuthoritySourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 14,321
MWh - Fuel burned, 2025
- 48,864
MMBtu - Capacity factor, 2025
- 10.9
% - Heat rate, 2025
- Not stated
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 14,321 | 48,864 | 10.9% | — |
| 2024 | 8,749 | 29,851 | 6.6% | — |
| 2023 | 8,379 | 28,589 | 6.4% | — |
| 2022 | 11,957 | 40,798 | 9.1% | — |
| 2021 | 5,520 | 48,818 | 4.2% | — |
| 2020 | 8,429 | 73,896 | 6.4% | — |
| 2019 | 21,846 | 194,538 | 16.6% | — |
| 2018 | 18,118 | 164,945 | 13.8% | — |
| 2017 | 9,154 | 84,337 | 7.0% | — |
| 2016 | 16,479 | 152,134 | 12.5% | — |
| 2015 | 1,951 | 18,182 | 1.5% | — |
| 2014 | 4,682 | 44,525 | 3.6% | — |
| 2013 | 6,384 | 60,910 | 4.9% | — |
| 2012 | 4,518 | 42,992 | 3.4% | — |
| 2011 | 16,857 | 163,783 | 12.8% | — |
| 2010 | 2,272 | 22,165 | 1.7% | — |
| 2009 | 15,485 | 151,134 | 11.8% | — |
| 2008 | 14,866 | 146,489 | 11.3% | — |
| 2007 | 15,082 | 149,072 | 11.5% | — |
| 2006 | 14,458 | 143,409 | 11.0% | — |
| 2005 | 25,106 | 251,035 | 19.1% | — |
| 2004 | 23,677 | 237,291 | 18.0% | — |
| 2003 | 14,761 | 151,167 | 11.2% | — |
| 2002 | 12,013 | 122,208 | 9.1% | — |
| 2001 | 9,549 | 98,670 | 7.3% | — |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.
Sources
2 sourcesSources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)