Show on map
Intermountain Power Project — Power plant · Gas, combined cycle · Los Angeles Department of Water & PowerGale 1 Solar — Announced · Solar + storage · UT · 450 MW · 2.0 mi awayUtah Solar 1 — Announced · Solar · UT · 300 MW · 3.9 mi awayNotch Peak Solar LLC — Permitted · Solar · UT · 324 MW · 4.3 mi awayIntermountain Pumped Storage Project — Announced · Pumped hydro storage · UT · 1,000 MW · 9.9 mi away
  • Combustion
  • Wind & solar
  • Storage
  • In development
  • Operating
  • 10 · 100 · 1,000 MW

Intermountain Power Project

Power plant · Gas, combined cycle

Key facts

Power plant · Gas, combined cycleran 50% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2025
Net generation, 2025
4,803,126 MWh
Grid
500 kV, 345 kV to Intermountain Power Agency (LDWP)
Location
Millard County, Utah

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Gas
  • Coal
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
Age
1 year since 2025
Unused energy
4,773 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
9,723 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110000470053
Subparts reported
C, D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1005628
Fuel burned (MMBtu), 202546,699,867
Capacity factor, 20250.502
Heat rate (Btu/kWh), 20259,722.8
Net generation (MWh), 20254,803,126.0
Balancing authority codeLDWP

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
1,640 MW
Generators retired
2
Capacity still in service
1,093.2 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Conventional Steam Coal820 MWRetiredOctober 2025
2Conventional Steam Coal820 MWRetiredNovember 2025

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
500 kV, 345 kV
Transmission or distribution system owner
Intermountain Power Agency
Balancing authority
Los Angeles Department of Water and Power
NERC region
WECC
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies3
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Los Angeles Department of Water & Power Operator EIA-860M
Intermountain Power Agency Owner 100.0% Dec 31, 2023 EPA GHGRP
Intermountain Power Agency Owner 100.0% Dec 31, 2025 EIA-860

Timeline

  • Stated Unit 2 scheduled to retire, 820 MW · EIA-860M
  • Stated Unit 1 scheduled to retire, 820 MW · EIA-860M
  • In service · EIA-860M

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Gale 1 Solar Announced Solar + storage 2.0 mi 450
Utah Solar 1 Announced Solar 3.9 mi 300
Notch Peak Solar LLC Permitted Solar 4.3 mi 324
Intermountain Pumped Storage Project Announced Pumped hydro storage 9.9 mi 1,000

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution