1 asset
1 asset. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Not on this map: 7 projects: placed by county or state, a license that withholds the site, or a stage the map draws no dot for (withdrawn, cancelled, frozen or not stated). Each is in its tab below.
Intermountain Power Agency
Power plant owner
Key facts
Power plant owner · 1,093.2 MW- Capacity held
- 1,093.2MW
- Assets
- 1
- Projects
- 7
- States
- UT
- Registered in
- United States
- Website
- ipautah.com Source: Wikidata
- Wikipedia
- English article Source: Wikidata
- Parent
- No parent recordedNo parent recordedLike 48,118 of 50,271 companies here. Why
Gross output of plants with a stake
1 of 1 plantOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 1 of 1 plant with a stake: US plants with an EIA monthly series.100% of the output is from 1 plant recorded as wholly owned.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.
- Gas
Yearly totals
| Year | Gas | Total (MWh) |
|---|---|---|
| 2026 (part year) | 3,863,255 | 3,863,255 |
| 2025 | 4,803,126 | 4,803,126 |
| 2024 | 5,707,831 | 5,707,831 |
| 2023 | 4,448,880 | 4,448,880 |
| 2022 | 5,510,314 | 5,510,314 |
| 2021 | 7,580,586 | 7,580,586 |
| 2020 | 6,761,939 | 6,761,939 |
| 2019 | 7,561,844 | 7,561,844 |
| 2018 | 8,499,300 | 8,499,300 |
| 2017 | 8,413,932 | 8,413,932 |
| 2016 | 8,403,850 | 8,403,850 |
| 2015 (part year) | 10,860,909 | 10,860,909 |
| 2014 | 12,369,826 | 12,369,826 |
| 2013 | 12,387,224 | 12,387,224 |
| 2012 | 9,763,629 | 9,763,629 |
| 2011 | 13,002,872 | 13,002,872 |
| 2010 | 13,079,502 | 13,079,502 |
| 2009 | 13,555,580 | 13,555,580 |
| 2008 | 14,449,788 | 14,449,788 |
| 2007 | 14,426,479 | 14,426,479 |
| 2006 | 14,451,689 | 14,451,689 |
| 2005 | 13,664,259 | 13,664,259 |
| 2004 | 14,435,278 | 14,435,278 |
| 2003 | 13,563,388 | 13,563,388 |
| 2002 | 13,485,597 | 13,485,597 |
| 2001 | 13,390,784 | 13,390,784 |
Sources EIA-860 · EIA-860M · EIA · EPA GHGRP
Sources
- EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Projects 7
Capacity
2.40 GW
none active
15 possible duplicatesPossible duplicatesThese queue requests name no project and may be a plant already listed, so they are not counted.
Assets 1
Assets
1
Capacity
1,093 MW
- Gas, combined cycle: 1,093 MW, 1 asset
Owns 1 power plant
| Name. Sort by name, A to Z | Type. Sort by type, A to Z | Role. Sort by role, A to Z | MW, sorted descending. Sort by capacity, smallest first | State. Sort by state, A to Z | Share | Held by |
|---|---|---|---|---|---|---|
| Intermountain Power Project | Gas, combined cycle | Owns | 1,093.2 MW | US-UT | 100.0% | Intermountain Power Agency |
Sources 3
Registers
3
Reuse terms
- 2 Open license
- 1 Open license, with credit
Latest read
2026-11-04
From its recordsSourcesThe registers behind this company's assets, projects and RFPs and the facts under its name; the company record itself is derived from them.
Sources
-
View at source →
EIA-860M ·
EIA-860M Preliminary Monthly Electric Generator Inventory
US federal work — public domain
Summary only: the source’s license keeps the full record at the source.
-
View at source →
Berkeley Lab ·
LBNL "Queued Up" project-level interconnection queue data file (non-ISO regions)
Lawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker. · license
Publication page https://eta-publications.lbl.gov/publications/queued-2026-edition-characteristics, retrieved 2026-10-23 (HTTP 200) — "Copyright Notice: The Queued Up data file is licensed CC BY 4.0. You may use, share, or adapt the dataset as long as you attribute it to Lawrence Berkeley National Laboratory and GridTracker." and "Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker. CC BY 4.0. All rights reserved." The file's Introduction sheet adds the DOE contract notice ("This dataset has been authored by an author at Lawrence Berkeley National Laboratory under Contract No. DE-AC02-05CH11231 with the U.S. Department of Energy ...") and the standard no-warranty disclaimer
-
View at source →
Wikidata ·
Wikidata — company items (official website, headquarters, description, LEI, stock listing, English Wikipedia link)
Source: Wikidata (CC0) · license
Wikidata:Copyright (https://www.wikidata.org/wiki/Wikidata:Copyright, read 2026-10-22): "All structured data from the main, Property, Lexeme, and EntitySchema namespaces is available under the Creative Commons CC0 License; text in the other namespaces is available under the Creative Commons Attribution-ShareAlike License; additional terms may apply." Wikidata:Licensing (read 2026-10-22): "All structured data (i.e. the main, Property, Lexeme, and EntitySchema namespaces) is released into the public domain under Creative Commons Zero." Access terms that bind us: Wikimedia Foundation User-Agent Policy (read 2026-10-22) "Scripts should use an informative User-Agent string with contact information, or they may be blocked without notice." and "Do not copy a browser's user agent for your bot, as bot-like behavior with a browser's user agent will be assumed malicious."; Wikimedia Foundation API Usage Guidelines v1.0 (2024-08-26) "When using Wikimedia APIs, an operator must: Follow the User-Agent policy ...; Follow rate limiting requests ...; Follow the requirements of the content licenses when republishing downloaded or cached data" and must not "Spread Wikimedia API requests over multiple user agents to hide excessive use by a single operator"; Robot policy (wikitech, read 2026-10-22) "Honor every directive in our robots.txt file.", "When we reply with a 429 Too Many Requests status code respect the delay specified by the Retry-After header", and, Action API rules, "If unauthenticated, keep the concurrency of your requests to 1 at a time, and below 5 requests per second overall." and "if your request takes more than 1 second to serve, please wait 5 seconds before making another request."; Wikidata Query Service User Manual (mediawiki.org, read 2026-10-22) "SPARQL queries can be submitted directly to the SPARQL endpoint with a GET or POST request to https://query.wikidata.org/sparql", "One client (user agent + IP) is allowed 60 seconds of processing time each 60 seconds", "Clients exceeding the limits above are throttled with HTTP code 429. Use Retry-After header to see when the request can be repeated." and "access to the service is limited to 5 parallel queries per IP."
Summary only: the source’s license keeps the full record at the source.
Around this company
Nearby 4
within 25 kmProjects
4
within 25 km
Nearest
3.3 km
Gale 1 Solar
All 4NearbyShowing all 4 nearby projects.
| Status | Name. Sort by name, A to Z | Type | MW. Sort by capacity, largest first | Distance, sorted ascending. Sort by distance, farthest first | Nearest asset |
|---|---|---|---|---|---|
| Announced | Gale 1 Solar | Solar + storage | 450 MW | 3.3 km away | nearest: Intermountain Power Project |
| Announced | Utah Solar 1 | Solar | 300 MW | 6.2 km away | nearest: Intermountain Power Project |
| Permitted | Notch Peak Solar LLC | Solar | 324 MW | 7.0 km away | nearest: Intermountain Power Project |
| Announced | Intermountain Pumped Storage Project | Pumped hydro storage | 1,000 MW | 16.0 km away | nearest: Intermountain Power Project |