Jeffco Community Solar Gardens LLC — Power plant · Solar · SunShare ManagementORACLE AMERICA - BROOMFIELD CAMPUS — Built · Large load · CO · 4.5 mi awayLOCKHEED MARTIN - DENVER DATA CENTER — Built · Large load · CO · 8.0 mi awayIRON MOUNTAIN DATA CENTERS - FORTRUST — Built · Large load · CO · 11.1 mi awayJPMORGAN CHASE - PROJ SYCAMORE-BROOMFIEL — Built · Large load · CO · 11.1 mi awayCORESITE REAL ESTATE DE3 - CORESITE DE3 — Built · Large load · CO · 11.2 mi awayCORESITE - DE1 — Built · Large load · CO · 11.4 mi awayINTELISHIFT US LLC - DENVER DATA CENTER — Built · Large load · CO · 14.0 mi awayFront Range Project — Postponed · Biomass · CO · 1.6 MW · 14.0 mi away
  • Wind & solar
  • Loads
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Jeffco Community Solar Gardens LLC

Power plant · Solar

Key facts

Power plant · Solarran 23% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2016
Net generation, 2025
2,371 MWh
Grid
13 kV to Public Service Co of Colorado (PSCO)
Location
Jefferson County, Colorado

Output

Net generation MWh by year, 2016 to 2025

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
10 years since 2016
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000816272
Location id
L100000813562
Eia plant ids
60320
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
13.20
Transmission owner
Public Service Co of Colorado
Balancing authority code
PSCO
Balancing authority name
Public Service Company of Colorado
Fuel burned (MMBtu), 20258,090
Capacity factor, 20250.226
Net generation (MWh), 20252,371
Balancing authority codePSCO

Solar arrays

Array area (acres)
7.5
AC capacity (MW)
1.2
DC capacity (MW)
1.5
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2016

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
SunShare Management Operator EIA-860M
Jeffco Community Solar Gardens LLC Owner 100.0% Dec 31, 2025 EIA-860

Timeline

  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory
  • EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
ORACLE AMERICA - BROOMFIELD CAMPUS Built Large load 4.5 mi
LOCKHEED MARTIN - DENVER DATA CENTER Built Large load 8.0 mi
IRON MOUNTAIN DATA CENTERS - FORTRUST Built Large load 11.1 mi
JPMORGAN CHASE - PROJ SYCAMORE-BROOMFIEL Built Large load 11.1 mi
CORESITE REAL ESTATE DE3 - CORESITE DE3 Built Large load 11.2 mi
CORESITE - DE1 Built Large load 11.4 mi
INTELISHIFT US LLC - DENVER DATA CENTER Built Large load 14.0 mi
Front Range Project Postponed Biomass 14.0 mi 1.6

Sources EPA ICIS-Air · EIA-860M

Sources

Attribution