Show on map
Jester Solar — Power plant · Solar · Sol SystemsIcarus Solar — Postponed · Solar · NC · 3 MW · 3.1 km awayWilfork Solar — Postponed · Solar · NC · 5 MW · 9.0 km awayBear Point Solar, LLC — Postponed · Solar · NC · 73.9 MW · 13.4 km awayBradley Farm (Dudley) — Postponed · Solar · NC · 5 MW · 17.0 km awayRoady Lane Farm LLC — Postponed · Solar · NC · 74.8 MW · 17.1 km awayAlexis Solar — Postponed · Solar · NC · 5 MW · 20.8 km awayStevens Mill Solar — Filed · Solar · NC · 80 MW · 21.1 km awayWommack Farm — Postponed · Solar · NC · 5 MW · 24.7 km away
  • Wind & solar
  • In development
  • Operating
  • 10 · 100 · 1,000 MW

Jester Solar

Power plant · Solar

Key facts

Power plant · Solarran 21% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2020
Net generation, 2025
9,359 MWh
Grid
23 kV to Duke Energy Progress - (NC) (DUK)
Location
Wayne County, North Carolina
Operated by
Sol SystemsSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2020 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
6 years since 2020
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000816283
Location id
L100000813572
Eia plant ids
60290
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
23
Transmission owner
Duke Energy Progress - (NC)
Balancing authority code
DUK
Balancing authority name
Duke Energy Carolinas
Fuel burned (MMBtu), 202531,933
Capacity factor, 20250.214
Net generation (MWh), 20259,359
Balancing authority codeDUK

Solar arrays

Array area (acres)
21.9
AC capacity (MW)
4.9
DC capacity (MW)
7.1
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2020

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Icarus Solar Postponed Solar 3.1 km 3
Wilfork Solar Postponed Solar 9.0 km 5
Bear Point Solar, LLC Postponed Solar 13.4 km 73.9
Bradley Farm (Dudley) Postponed Solar 17.0 km 5
Roady Lane Farm LLC Postponed Solar 17.1 km 74.8
Alexis Solar Postponed Solar 20.8 km 5
Stevens Mill Solar Filed Solar 21.1 km 80
Wommack Farm Postponed Solar 24.7 km 5

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution