Show on map
Roady Lane Farm LLCBradley Farm (Dudley) — Postponed · Solar · NC · 5 MW · 0.1 mi awayStevens Mill Solar — Filed · Solar · NC · 80 MW · 4.7 mi awayCalypso Farm — Postponed · Solar · NC · 5 MW · 11.0 mi awayWilfork Solar — Postponed · Solar · NC · 5 MW · 11.4 mi awayPanther Branch Solar, LLC — Filed · Solar + storage · NC · 112 MW · 12.4 mi awaySadie Solar — Postponed · Solar · NC · 5 MW · 12.4 mi awayIcarus Solar — Postponed · Solar · NC · 3 MW · 12.6 mi awayFaison Farm — Postponed · Solar · NC · 5 MW · 13.1 mi awaySignature Solar — Postponed · Solar · NC · 5 MW · 13.2 mi awayLongleaf Solar — Postponed · Solar · NC · 5 MW · 13.3 mi awayFibroCoast — Postponed · Biomass · NC · 60 MW · 14.9 mi away
  • Wind & solar
  • In development
  • 10 · 100 · 1,000 MW

Roady Lane Farm LLC

Solar

Capacity
Capacity: sourceEIA-860M · Open licenseMW
Interconnection queue
Duke Energy Progress East (CPLE)
Location
Wayne County, North Carolina

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Solar source: “Solar Photovoltaic”
EIA plant
59108 generator 1

Timeline

  • Observed as postponed in EIA-860M (source status: “Canceled or Postponed”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Bradley Farm (Dudley) Postponed Solar 0.1 mi 5
Stevens Mill Solar Filed Solar 4.7 mi 80
Calypso Farm Postponed Solar 11.0 mi 5
Wilfork Solar Postponed Solar 11.4 mi 5
Panther Branch Solar, LLC Filed Solar + storage 12.4 mi 112
Sadie Solar Postponed Solar 12.4 mi 5
Icarus Solar Postponed Solar 12.6 mi 3
Faison Farm Postponed Solar 13.1 mi 5
Signature Solar Postponed Solar 13.2 mi 5
Longleaf Solar Postponed Solar 13.3 mi 5
FibroCoast Postponed Biomass 14.9 mi 60

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution