John C Boyle: location and 1 exact-grade project within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
John C Boyle
Power plant · Hydro
Key facts
Power plant · Hydroran 0% of 2024 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1958
- Net generation, 2024
- 3,311 MWh
- Grid
- 230 kV to PacifiCorp (PACW)
- Location
- Klamath County, Oregon
- Operated by
- PacifiCorpSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Hydro source: “Conventional Hydroelectric”
- Age
- 68 years since 1958
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Balancing authority code | PACW |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- January 2024
- Capacity retired
- 98.7 MW
- Generators retired
- 2
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 1 | Conventional Hydroelectric | 50.3 MW | Retired | January 2024 |
| 2 | Conventional Hydroelectric | 48.4 MW | Retired | January 2024 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 230 kV
- Transmission or distribution system owner
- PacifiCorp
- Balancing authority
- PacifiCorp - West
- NERC region
- WECC
Transmission lines within 15 mi (2)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Units 1, 2 scheduled to retire, 98.7 MW · EIA-860M
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · GEM · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory