Show on map
Kake — Power plant · Oil · Inside Passage Elec Coop, Inc
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Oil

Key facts

Power plant · Oilran 6% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1993
Net generation, 2025
1,669 MWh
Grid
12 kV to Inside Passage Elec Coop, Inc
Location
Wrangell Petersburg County, Alaska
Operated by
Inside Passage Elec Coop, IncSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2002 to 2025
Fuel burned MMBtu by year, 2002 to 2025
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
33 years since 1993
Unused energy
25 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
10,002 Btu/kWh 2025
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Fuel burned (MMBtu), 202516,694
Capacity factor, 20250.061
Heat rate (Btu/kWh), 202510,002.4
Net generation (MWh), 20251,669

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
1.9 MW
Generators retired
3
Capacity still in service
3.1 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Petroleum Liquids0.6 MWRetiredJanuary 2012
1APetroleum Liquids0.5 MWRetiredSeptember 2017
3APetroleum Liquids0.8 MWRetiredSeptember 2017

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
12 kV
Transmission or distribution system owner
Inside Passage Elec Coop, Inc
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units 1A, 3A scheduled to retire, 1.3 MW · EIA-860M
  • Stated Unit 1 scheduled to retire, 0.6 MW · EIA-860M
  • In service · EIA-860M

Sources

3 sources

View at source