- Combustion
- Operating
- 10 · 100 · 1,000 MW
Map
- Combustion
- Operating
Kake: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Kake
Power plant · Oil
Key facts
Power plant · Oilran 6% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1993
- Net generation, 2025
- 1,669 MWh
- Grid
- 12 kV to Inside Passage Elec Coop, Inc
- Location
- Wrangell Petersburg County, Alaska
- Operated by
- Inside Passage Elec Coop, IncSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 1,669
MWh - Fuel burned, 2025
- 16,694
MMBtu - Capacity factor, 2025
- 6.2
% - Heat rate, 2025
- 10,002
Btu/kWh
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 1,669 | 16,694 | 6.2% | 10,002 |
| 2024 | 1,727 | 16,182 | 6.3% | 9,370 |
| 2023 | 1,510 | 18,182 | 5.6% | 12,041 |
| 2022 | 1,528 | 19,349 | 5.6% | 12,663 |
| 2021 | 1,367 | 13,828 | 5.0% | 10,116 |
| 2020 | 2,188 | 18,749 | 8.0% | 8,569 |
| 2019 | 2,139 | 18,764 | 7.9% | 8,772 |
| 2018 | 2,133 | 20,242 | 7.8% | 9,490 |
| 2017 | 2,137 | 23,479 | 7.9% | 10,987 |
| 2016 | 2,139 | 23,094 | 7.9% | 10,797 |
| 2015 | 2,201 | 23,925 | 8.1% | 10,870 |
| 2014 | 2,683 | 29,273 | 9.9% | 10,910 |
| 2013 | 2,969 | 29,888 | 10.9% | 10,067 |
| 2012 | 2,891 | 30,289 | 10.6% | 10,477 |
| 2011 | 2,690 | 29,481 | 9.9% | 10,960 |
| 2010 | 2,392 | 26,985 | 8.8% | 11,281 |
| 2009 | 2,417 | 27,762 | 8.9% | 11,486 |
| 2008 | 2,447 | 28,008 | 9.0% | 11,446 |
| 2007 | 2,369 | 27,075 | 8.7% | 11,429 |
| 2006 | 3,187 | 34,804 | 11.7% | 10,921 |
| 2005 | 2,496 | 27,353 | 9.2% | 10,959 |
| 2004 | 2,728 | 29,355 | 10.0% | 10,761 |
| 2003 | 3,915 | 40,658 | 14.4% | 10,385 |
| 2002 | 4,291 | 43,256 | 15.8% | 10,081 |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.