Kensico: location and 5 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Kensico
Power plant · Hydro
Key facts
Power plant · Hydroran 5% of 2011 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1983
- Net generation, 2011
- 1,209 MWh
- Grid
- 14 kV to Consolidated Edison Co-NY Inc (NYIS)
- Location
- Westchester County, New York
- Operated by
- New YORK Power AuthoritySourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Hydro source: “Conventional Hydroelectric”
- Age
- 43 years since 1983
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Balancing authority code | NYIS |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- September 2012
- Capacity retired
- 3 MW
- Generators retired
- 3
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 1 | Conventional Hydroelectric | 1 MW | Retired | September 2012 |
| 2 | Conventional Hydroelectric | 1 MW | Retired | September 2012 |
| 3 | Conventional Hydroelectric | 1 MW | Retired | September 2012 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 14 kV
- Transmission or distribution system owner
- Consolidated Edison Co-NY Inc
- Balancing authority
- New York Independent System Operator
- NERC region
- NPCC
Transmission lines within 25 km (10)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Units 1, 2, 3 scheduled to retire, 3 MW · EIA-860M
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| ORANGETOWN DATA CENTER Built | Large load | 17.2 km | |
| DATA CENTER BUILDING EXPANSION Under construction | Large load | 17.8 km | |
| Bowline Point Postponed | Gas, combined cycle | 21.0 km | 750 |
| Eastern BlueBird Clean Energy LLC Under construction | Storage | 22.7 km | 4.4 |
| Northern Cardinal Clean Energy, LLC Under construction | Storage | 22.7 km | 4.4 |
Sources EPA ICIS-Air · EPA ICIS-NPDES · EIA-860M