Keuka
Power plant · Hydro
Key facts
Power plant · Hydro Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1928
- Grid
- New York State Elec & Gas Corp (NYIS)
- Location
- Steuben County, New York
- Operated by
- New York State Elec & Gas CorpSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Hydro source: “Conventional Hydroelectric”
- Age
- 98 years since 1928
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Balancing authority code | NYIS |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- November 2006
- Capacity retired
- 2 MW
- Generators retired
- 1
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 1 | Conventional Hydroelectric | 2 MW | Retired | November 2006 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Transmission or distribution system owner
- New York State Elec & Gas Corp
- Balancing authority
- New York Independent System Operator
- NERC region
- NPCC
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Unit 1 scheduled to retire, 2 MW · EIA-860M
- In service · EIA-860M
Sources
2 sourcesAround this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Chidsey Hill Road Solar Under construction | Solar | 5.9 mi | 3 |
| Ecogen Wind Postponed | Wind | 11.7 mi | 272 |
| Watkins Glen Wind Energy Center Postponed | Wind | 14.6 mi | 80 |
Sources EIA-860M