Show on map
Kingwood - Humble 138 kV — Transmission lineSMT DC Houston II (Houston data centre) — Filed · Large load · TX · 6.2 mi awayCPV Pondera King Energy Center — Postponed · Gas, combined cycle · TX · 900 MW · 6.3 mi awayTX Houston 7080 Express Lane — Postponed · Storage · TX · 1.5 MW · 12.0 mi awayGreens Bayou 6 — Under construction · Gas, combustion turbine · TX · 445 MW · 12.3 mi awayNoor Solar — Filed · Solar · TX · 188.2 MW · 13.9 mi awayBESS TX Camarine - BSHOU001 — Under construction · Storage · TX · 9.9 MW · 14.9 mi away
  • Combustion
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Kingwood - Humble 138 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
138 kV
States crossed
US-TX
Owner (as stated)
Centerpoint Energy Houston Electric

Details

Who’s behind it

Owner
Centerpoint Energy Houston Electric

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
8
Substations at the ends (as the source names them)
Kingwood to Humble
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itcenterpoint energy houston electric
HIFLD line ID312889
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
SMT DC Houston II (Houston data centre) Filed Large load 6.2 mi
CPV Pondera King Energy Center Postponed Gas, combined cycle 6.3 mi 900
TX Houston 7080 Express Lane Postponed Storage 12.0 mi 1.5
Greens Bayou 6 Under construction Gas, combustion turbine 12.3 mi 445
Noor Solar Filed Solar 13.9 mi 188.2
BESS TX Camarine - BSHOU001 Under construction Storage 14.9 mi 9.9

Sources FAA OE/AAA · EIA-860M · ERCOT

Sources

  • FAA OE/AAAOpen license · retrieved Nov 16, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026

Attribution