Show on map
Lafayette Horizon Solar CSG LLC — Power plant · Solar · AES Distributed EnergyJPMORGAN CHASE - PROJ SYCAMORE-BROOMFIEL — Built · Large load · CO · 2.3 mi awayFront Range Project — Postponed · Biomass · CO · 1.6 MW · 4.5 mi awayORACLE AMERICA - BROOMFIELD CAMPUS — Built · Large load · CO · 5.2 mi awayLOCKHEED MARTIN - DENVER DATA CENTER — Built · Large load · CO · 10.8 mi awaySpindle BESS — Under construction · Storage · CO · 199 MW · 11.5 mi awayAMERICAN HONDA MOTORS CO. - DATA CENTER — Built · Large load · CO · 11.9 mi awayCORESITE REAL ESTATE DE3 - CORESITE DE3 — Built · Large load · CO · 14.6 mi awayIRON MOUNTAIN DATA CENTERS - FORTRUST — Built · Large load · CO · 14.9 mi away
  • Wind & solar
  • Storage
  • Loads
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Lafayette Horizon Solar CSG LLC

Power plant · Solar

Key facts

Power plant · Solarran 23% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2019
Net generation, 2025
3,163 MWh
Grid
13 kV to Public Service Co of Colorado (PSCO)
Location
Boulder County, Colorado
Operated by
AES Distributed EnergySourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2019 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
7 years since 2019
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000816426
Location id
L100000813705
Eia plant ids
62667
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
13.20
Transmission owner
Public Service Co of Colorado
Balancing authority code
PSCO
Balancing authority name
Public Service Company of Colorado
Fuel burned (MMBtu), 202510,790
Capacity factor, 20250.226
Net generation (MWh), 20253,163
Balancing authority codePSCO

Solar arrays

Array area (acres)
10.3
AC capacity (MW)
1.6
DC capacity (MW)
2
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2019

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
JPMORGAN CHASE - PROJ SYCAMORE-BROOMFIEL Built Large load 2.3 mi
Front Range Project Postponed Biomass 4.5 mi 1.6
ORACLE AMERICA - BROOMFIELD CAMPUS Built Large load 5.2 mi
LOCKHEED MARTIN - DENVER DATA CENTER Built Large load 10.8 mi
Spindle BESS Under construction Storage 11.5 mi 199
AMERICAN HONDA MOTORS CO. - DATA CENTER Built Large load 11.9 mi
CORESITE REAL ESTATE DE3 - CORESITE DE3 Built Large load 14.6 mi
IRON MOUNTAIN DATA CENTERS - FORTRUST Built Large load 14.9 mi

Sources EPA ICIS-Air · EIA-860M

Sources

Attribution