Show on map
- Storage
- Loads
- In development
- Under construction
- Operating
- Stage not stated
- Size not stated
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Storage
- Loads
- In development
- Under construction
- Operating
- Stage not stated
- Size not stated
- Other infrastructure
Lake Hubbard 138 kV line: route and 10 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Lake Hubbard 138 kV line
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 138 kV
- States crossed
- US-TX
- Owner (as stated)
- Farmers Electric Coop
Details
Who’s behind it
- Owner
- Farmers Electric Coop
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 8
- Substations at the ends (as the source names them)
- Lake Hubbard
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| Owner, as the source states it | farmers electric coop |
| HIFLD line ID | 301100 |
| Voltage class | 100-161 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Malala Postponed | Storage | 6.7 mi | 200 |
| DLR 40 (Garland data centre) Filed | Large load | 11.3 mi | |
| NTT TX-4 DATA CENTER Under construction | Large load | 11.6 mi | |
| RAGINGWIRE DATA CENTER Built | Large load | 11.7 mi | |
| SDC DFW-VII DATA CENTER PHASE 2 Built | Large load | 11.7 mi | |
| BANK OF AMERICA - RTX MODULAR DATA CENTER Built | Large load | 12.0 mi | |
| EDGECORE DATACENTER - FUJITSU CAMPUS ADDITION Unknown | Large load | 12.3 mi | |
| Boxcar Energy Storage Under construction | Storage | 12.6 mi | 150 |
| FLEXENTIAL DATA CENTER EXPANSION Built | Large load | 13.5 mi | |
| ALIGNED DATA CENTER MEMORY TECH PHASE 1 ADDITION Built | Large load | 13.9 mi |
Sources EIA-860M · FAA OE/AAA · EPA ICIS-NPDES