Show on map
MalalaQTS Data Centers 6 and 7 — Filed · Large load · TX · 17.4 km awayStream Fir Data Center — Filed · Large load · TX · 17.8 km awayTX Dallas 7750 Dynasty Drive — Under construction · Solar · TX · 2.3 MW · 19.7 km awayQTS - DFW 3 - DC1 — Filed · Large load · TX · 20.1 km awaySTACK DFW02A (Lancaster data centre) — Under construction · Large load · TX · 20.2 km awayDatabank 13 — Filed · Large load · TX · 21.9 km awayDatabank Red Oak Campus - DFW 11 — Filed · Large load · TX · 23.2 km awayMEI Temporary Crane (Lancaster data centre) — Filed · Large load · TX · 23.7 km awayLANCASTER DATA CENTER — Under construction · Large load · TX · 23.8 km away
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Size not stated
  • 10 · 100 · 1,000 MW

Storage

Capacity
Capacity: sourceEIA-860M · Open licenseMW
Location
Dallas County, Texas

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Storage source: “Batteries”
EIA plant
67660 generator MALAL

Timeline

  • Observed as postponed in EIA-860M (source status: “Canceled or Postponed”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
QTS Data Centers 6 and 7 Filed Large load 17.4 km
Stream Fir Data Center Filed Large load 17.8 km
TX Dallas 7750 Dynasty Drive Under construction Solar 19.7 km 2.3
QTS - DFW 3 - DC1 Filed Large load 20.1 km
STACK DFW02A (Lancaster data centre) Under construction Large load 20.2 km
Databank 13 Filed Large load 21.9 km
Databank Red Oak Campus - DFW 11 Filed Large load 23.2 km
MEI Temporary Crane (Lancaster data centre) Filed Large load 23.7 km
LANCASTER DATA CENTER Under construction Large load 23.8 km

Sources FAA OE/AAA · EIA-860M · EPA ICIS-NPDES

Sources

Attribution