Show on map
- Wind & solar
- Storage
- In development
- Under construction
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Storage
- In development
- Under construction
- Other infrastructure
Lake Road - Card 345 kV: route and 9 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Lake Road - Card 345 kV
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 345 kV
- States crossed
- US-CT
- Owner (as stated)
- Connecticut Light Power
Details
Who’s behind it
- Owner
- Connecticut Light Power
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 29
- Substations at the ends (as the source names them)
- Lake Road to Card
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| Owner, as the source states it | connecticut light power |
| HIFLD line ID | 127088 |
| Voltage class | 345 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Killingly Energy Center Postponed | Gas, combined cycle | 0.2 mi | 843 |
| KCE CT 1, LLC Announced | Storage | 0.4 mi | 45 |
| Putnam Meadow Solar Station Filed | Solar | 1.8 mi | 4 |
| Lebanon Solar 1 Postponed | Solar | 5.0 mi | 2 |
| Lebanon Solar 2 Postponed | Solar | 5.1 mi | 2 |
| Pure Hedge LLC Under construction | Solar + storage | 8.8 mi | 90 |
| Plainfield Solar One Under construction | Solar | 8.9 mi | 4 |
| Willington Solar One, LLC Under construction | Solar | 11.7 mi | 2 |
| CMEEC - Hollyhock Solar Postponed | Solar | 14.2 mi | 6 |
Sources EIA-860M