Show on map
Larned — Power plant · Oil · City of Larned - (KS)
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Oil

Key facts

Power plant · Oil Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1976
Net generation, 2025
-408 MWh
Grid
14 kV to City of Larned - (KS) (SWPP)
Location
Pawnee County, Kansas
Operated by
City of Larned - (KS)SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
50 years since 1976
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Eia status
By code
OP
Mw
14.40
Units
5
OS
Mw
2
Units
1
Standby mw
0
Status rule
some_units_retired
In service mw
16.40
Out of service mw
2
Fuel burned (MMBtu), 2025479
Net generation (MWh), 2025-408
Balancing authority codeSWPP
Data notes (2)
  • Capacity factor, 2025 not shown: net generation -408.0 MWh is not positive (the plant consumed at least as much as it produced over the year)
  • Heat rate (Btu/kWh), 2025 not shown: fuel burned but net generation is not positive

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
12.8 MW
Generators retired
3
Capacity still in service
16.4 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Natural Gas Steam Turbine1.5 MWRetiredDecember 2010
2Natural Gas Steam Turbine3 MWRetiredDecember 2010
3Natural Gas Steam Turbine8.3 MWRetiredDecember 2010

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
14 kV
Transmission or distribution system owner
City of Larned - (KS)
Balancing authority
Southwest Power Pool
NERC region
MRO
Transmission lines within 25 km (1)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units 1, 2, 3 scheduled to retire, 12.8 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory