Leviton Manufacturing: location and 4 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Leviton Manufacturing
Power plant · Oil
Key facts
Power plant · Oil Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2000
- Location
- EL PASO County, Texas
- Operated by
- Leviton Manufacturing IncSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Oil source: “Petroleum Liquids”
- Age
- 26 years since 2000
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Balancing authority code | EPE |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- December 2013
- Capacity retired
- 1.8 MW
- Generators retired
- 1
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| GEN1 | Petroleum Liquids | 1.8 MW | Retired | December 2013 |
Grid
EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).- Balancing authority
- EPE
Transmission lines within 15 mi (10)
- 115 kV line (OSM way 17298656)
- 115 kV line (OSM way 788099485)
- 115 kV line (OSM way 1287207004)
- 115 kV line (OSM way 1286926020)
- 115 kV line (OSM way 1286926028)
- 115 kV line (OSM way 1286926025)
- 115 kV line (OSM way 1286926026)
- 115 kV line (OSM way 1286926024)
- 115 kV line (OSM way 1286926027)
- 115 kV line (OSM way 1286926029)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Unit GEN1 scheduled to retire, 1.8 MW · EIA-860M
- In service · EIA-860M
Sources
3 sourcesSources EIA-860M · OpenStreetMap · EIA-860M Preliminary Monthly Electric Generator Inventory
© OpenStreetMap contributors
Sources
- EIA-860M
- OpenStreetMap© OpenStreetMap contributors. Power lines, cables and substations filtered and reshaped by Inframation from the OpenStreetMap elements in Overture Maps' base/infrastructure theme; this derived database is available under the Open Database License 1.0 as GeoParquet files at https://tiles.inframation.io/grid/osm-power/ (latest.json names the current version's files; licence: https://www.openstreetmap.org/copyright)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Project Miner County NM (Santa Teresa data centre) Filed | Large load | 8.1 mi | |
| Santa Teresa Solar Under construction | Storage | 9.5 mi | 150 |
| Newman Buffer Filed | Solar | 9.9 mi | 102.2 |
| IBOS - Seafox El Paso (El Paso data centre) Filed | Large load | 13.2 mi |
Sources FAA OE/AAA · EIA-860M