Lonestar
Power plant · Storage
Key facts
Power plant · Storage Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2022
- Net generation, 2025
- -302 MWh
- Grid
- 25 kV to Texas-New Mexico Power Co (ERCO)
- Location
- Ward County, Texas
- Operated by
- HEN Infrastructure, L.L.C.
Output
Details
Who’s behind it
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Storage source: “Batteries”
- Age
- 4 years since 2022
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 0 |
| Net generation (MWh), 2025 | -302 |
| Balancing authority code | ERCO |
Data notes (1)
- Capacity factor, 2025 not shown: net generation -302.0 MWh is not positive (the plant consumed at least as much as it produced over the year)
Ownership
4 companies4| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| HEN Infrastructure, L.L.C. | Operator | EIA-860M | ||
| Hunt Energy Network, LLC | Owner | 4.0% | 31 Dec 2025 | EIA-860 |
| John Hancock Funding Company | Owner | 43.1% | 31 Dec 2025 | EIA-860 |
| Manulife Infrastructure II Holdings A, L.P. | Owner | 52.9% | 31 Dec 2025 | EIA-860 |
Timeline
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Grey Wolf Under construction | Gas, combustion turbine | 19.5 km | 10 |
| NSCALE DATA CENTER - WARD COUNTY Under construction | Large load | 20.2 km | |
| Staghorn Gas Under construction | Gas, reciprocating engine | 21.8 km | 9.9 |
| CPV Basin Ranch Energy Center Under construction | Gas, combined cycle | 24.6 km | 1,350 |