Show on map
- Combustion
- Wind & solar
- Storage
- Loads
- In development
- Under construction
- Size not stated
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Combustion
- Wind & solar
- Storage
- Loads
- In development
- Under construction
- Size not stated
- Other infrastructure
Longhorn: route and 39 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Longhorn
Crude oil pipeline
Key facts
Crude oil pipeline Operating- Mapped route length
- Mapped route length: sourceEIA Energy Atlas · Open licensemiles
- States crossed
- US-TX
- Operated by
- Magellan Midstream PartnersSourceEIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 479
- Units
- 1
All 5 attributes from EIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)
| Attribute | Value |
|---|---|
| Mapped parts | 1 |
| Operator, as the source states it | MAGELLAN MIDSTREAM PARTNERS |
| Mapped segments | 1 |
| Source release | 202001 |
| Pipeline name raw | Longhorn |
Sources
2 sourcesSources EIA Energy Atlas · EIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)
Sources
- EIA Energy AtlasSource: U.S. Energy Information Administration, U.S. Energy Atlas, Crude Oil Pipelines (as of January 2020)
- EIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)
Around this pipeline
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Red Egret Under construction | Storage | 0.4 mi | 310.6 |
| BESS TX Camarine - BSHOU001 Under construction | Storage | 0.5 mi | 9.9 |
| Hidden Lakes Postponed | Storage | 0.9 mi | 9.9 |
| Zeya Under construction | Storage | 1.0 mi | 255.3 |
| Berkman Storage Postponed | Storage | 1.2 mi | 100 |
| SMT DC Austin I (Austin data centre) Filed | Large load | 1.4 mi | |
| Texas Petrochemicals Postponed | Gas, combined cycle | 1.9 mi | 560 |
| Staccato BESS Under construction | Storage | 2.1 mi | 201.8 |
| Prost ESS Studied | Storage | 2.9 mi | 202.7 |
| Vertus Energy Storage Plant Studied | Storage | 3.3 mi | 204.9 |
| TX Houston 7080 Express Lane Postponed | Storage | 3.5 mi | 1.5 |
| AMD Phase 2 (Austin data centre) Filed | Large load | 4.0 mi | |
| Greens Bayou 6 Under construction | Gas, combustion turbine | 4.7 mi | 445 |
| Austin TX GigaFactory × 2 units Under construction | Solar | 5.9 mi | 3.3 |
| NET Power La Porte Station Studied | Gas, combustion turbine | 5.9 mi | 25.5 |
| SERVERFARM - HOCKLEY 2 Under construction | Large load | 6.4 mi | |
| SMT DC Houston III (Hockley data centre) Filed | Large load | 6.5 mi | |
| King Mountain Solar Under construction | Solar | 6.7 mi | 175 |
| TX LaPort 10060 Porter Road Solar Postponed | Solar | 6.8 mi | 1.6 |
| Hockley Under construction | Storage | 6.9 mi | 9.9 |
| SERVERFARM LONGHORN Under construction | Large load | 7.4 mi | |
| Sealy Power Peaking Facility Postponed | Gas, combustion turbine | 7.9 mi | 200 |
| CPV Pondera King Energy Center Postponed | Gas, combined cycle | 8.2 mi | 900 |
| Upton BESS 2 Postponed | Storage | 9.4 mi | 150 |
| Metro BESS Studied | Storage | 9.4 mi | 200.7 |
| Dogwood Creek Solar and BESS Postponed | Solar + storage | 9.8 mi | 878.7 |
| US HPC Hub TX2.1 Data Center Filed | Large load | 10.4 mi | |
| Big Star Solar, LLC (Hybrid) Under construction | Storage | 10.4 mi | 80 |
| Crane 2 BESS 2 Postponed | Storage | 10.5 mi | 150 |
| SMT DC Houston II (Houston data centre) Filed | Large load | 11.0 mi | |
| Bocanova Energy Storage II Under construction | Storage | 12.1 mi | 150 |
| Mendoza Trail BESS Under construction | Storage | 13.3 mi | 200 |
| SMT DC Houston 1 (Tomball data centre) Filed | Large load | 13.5 mi | |
| John Paul Jones Postponed | Gas, reciprocating engine | 13.5 mi | 18.7 |
| Pamela Heights I Energy Center Under construction | Storage | 13.6 mi | 101.7 |
| Callisto II Energy Center Under construction | Storage | 13.6 mi | 303.2 |
| Willow Beach Wind Contracted | Wind | 13.7 mi | 202.3 |
| Baytown Postponed | Biomass | 13.9 mi | 1.3 |
Sources ERCOT · EIA-860M · FAA OE/AAA · EPA ICIS-NPDES