Longview - Marshall Steam Station 230 kV
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 230 kV
- States crossed
- US-NC
- Owner (as stated)
- Duke Energy Carolinas
Details
Who’s behind it
- Owner
- Duke Energy Carolinas
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 29
- Substations at the ends (as the source names them)
- Longview to Marshall Steam Station
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| Owner, as the source states it | duke energy carolinas |
| HIFLD line ID | 143482 |
| Voltage class | 220-287 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| MICROSOFT CORPORATION, CLT17 Built | Large load | 0.2 mi | |
| MICROSOFT CORPORATION, CLT10 Built | Large load | 0.9 mi | |
| APPLE INC. Built | Large load | 1.0 mi | |
| Austin Solar Postponed | Solar | 1.4 mi | 2 |
| Maiden Creek Battery Under construction | Storage | 1.5 mi | 50 |
| Clark Creek Solar Plant Filed | Solar + storage | 4.8 mi | 54 |
| CLT40 DATA CENTER Under construction | Large load | 6.0 mi | |
| CLT04 LYLE CREEK DATA CENTER Under construction | Large load | 9.4 mi | |
| RJ Solar Postponed | Solar | 10.2 mi | 5 |
| Tower Solar Center LLC Postponed | Solar | 11.3 mi | 5 |
| McDowell Creek Solar LLC Under construction | Solar | 13.9 mi | 2 |
| TAPAHA DYNAMICS, LLC Built | Large load | 14.5 mi | |
| Hornet Solar Under construction | Solar | 14.7 mi | 73 |
Sources EPA ICIS-Air · EPA ICIS-NPDES · EIA-860M