Longview - Marshall Steam Station 230 kV — Transmission lineMICROSOFT CORPORATION, CLT17 — Built · Large load · NC · 0.2 mi awayMICROSOFT CORPORATION, CLT10 — Built · Large load · NC · 0.9 mi awayAPPLE INC. — Built · Large load · NC · 1.0 mi awayAustin Solar — Postponed · Solar · NC · 2 MW · 1.4 mi awayMaiden Creek Battery — Under construction · Storage · NC · 50 MW · 1.5 mi awayClark Creek Solar Plant — Filed · Solar + storage · NC · 54 MW · 4.8 mi awayCLT40 DATA CENTER — Under construction · Large load · NC · 6.0 mi awayCLT04 LYLE CREEK DATA CENTER — Under construction · Large load · NC · 9.4 mi awayRJ Solar — Postponed · Solar · NC · 5 MW · 10.2 mi awayTower Solar Center LLC — Postponed · Solar · NC · 5 MW · 11.3 mi awayMcDowell Creek Solar LLC — Under construction · Solar · NC · 2 MW · 13.9 mi awayTAPAHA DYNAMICS, LLC — Built · Large load · NC · 14.5 mi awayHornet Solar — Under construction · Solar · NC · 73 MW · 14.7 mi away
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Longview - Marshall Steam Station 230 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-NC
Owner (as stated)
Duke Energy Carolinas

Details

Who’s behind it

Owner
Duke Energy Carolinas

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
29
Substations at the ends (as the source names them)
Longview to Marshall Steam Station
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itduke energy carolinas
HIFLD line ID143482
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
MICROSOFT CORPORATION, CLT17 Built Large load 0.2 mi
MICROSOFT CORPORATION, CLT10 Built Large load 0.9 mi
APPLE INC. Built Large load 1.0 mi
Austin Solar Postponed Solar 1.4 mi 2
Maiden Creek Battery Under construction Storage 1.5 mi 50
Clark Creek Solar Plant Filed Solar + storage 4.8 mi 54
CLT40 DATA CENTER Under construction Large load 6.0 mi
CLT04 LYLE CREEK DATA CENTER Under construction Large load 9.4 mi
RJ Solar Postponed Solar 10.2 mi 5
Tower Solar Center LLC Postponed Solar 11.3 mi 5
McDowell Creek Solar LLC Under construction Solar 13.9 mi 2
TAPAHA DYNAMICS, LLC Built Large load 14.5 mi
Hornet Solar Under construction Solar 14.7 mi 73

Sources EPA ICIS-Air · EPA ICIS-NPDES · EIA-860M

Sources

Attribution