Show on map
Luciana — Power plant · Solar · Tulare Solar Center, LLCRexford 2 Solar Farm — Contracted · Solar + storage · CA · 200 MW · 4.9 mi awayRanch 4701 — Under construction · Solar · CA · 2.3 MW · 5.7 mi awaySolar Photovoltaic Project #35 — Postponed · Solar · CA · 7 MW · 10.6 mi awaySolar Photovoltaic Project #46 — Postponed · Solar · CA · 3.5 MW · 10.9 mi away
  • Wind & solar
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Solar

Key facts

Power plant · Solarran 28% of 2025 Retiring
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2022
Net generation, 2025
137,133 MWh
Grid
65 kV to Southern California Edison Co (CISO)
Location
Tulare County, California
Operated by
Tulare Solar Center, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2022 to 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
4 years since 2022
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000810695
Location id
L100000808468
Eia plant ids
64909
Fuel burned (MMBtu), 2025467,898
Capacity factor, 20250.281
Net generation (MWh), 2025137,133
Balancing authority codeCISO

Solar array

Array area (acres)
287.5
AC capacity (MW)
55.8
DC capacity (MW)
72.5
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2022

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Retirement

EIA-860M September 2026StatusAt least half of the plant's in-service nameplate capacity is scheduled to retire, on dates its owner has reported to EIA. As of EIA-860M for September 2026.
Next scheduled retirement
April 2057
Capacity scheduled to retire
55.8 MW
Generators scheduled to retire
1
Share of in-service capacity scheduled
100%
Capacity still in service
55.8 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
TSCSolar Photovoltaic55.8 MWScheduled to retireApril 2057

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
65 kV
Transmission or distribution system owner
Southern California Edison Co
Balancing authority
California Independent System Operator
NERC region
WECC
Transmission lines within 15 mi (3)
Connection points within 15 mi (1)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit TSC scheduled to retire, 55.8 MW · EIA-860M
  • In service · EIA-860M

Sources

7 sources

Sources EIA-860M · GEM · LBNL · CAISO · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • CAISOOpen license, with credit · retrieved Nov 13, 2026Source: California ISO
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Rexford 2 Solar Farm Contracted Solar + storage 4.9 mi 200
Ranch 4701 Under construction Solar 5.7 mi 2.3
Solar Photovoltaic Project #35 Postponed Solar 10.6 mi 7
Solar Photovoltaic Project #46 Postponed Solar 10.9 mi 3.5

Sources CAISO · EIA-860M

Sources

  • CAISOOpen license, with credit · retrieved Nov 13, 2026Source: California ISO
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution