Show on map
Lugo - Rancho Vista 500 kV — Transmission lineSolar Photovoltaic Project #23 — Postponed · Solar · CA · 0.5 MW · 0.9 mi awaySolar Photovoltaic Project #19 — Postponed · Solar · CA · 5 MW · 0.9 mi awaySolar Photovoltaic Project #18 — Postponed · Solar · CA · 0.5 MW · 1.0 mi awaySolar Photovoltaic Project #21 — Postponed · Solar · CA · 2.5 MW · 1.2 mi awaySolar Photovoltaic Project #10 — Postponed · Solar · CA · 0.5 MW · 1.3 mi awaySolar Photovoltaic Project #31 — Postponed · Solar · CA · 1 MW · 1.4 mi awaySolar Photovoltaic Project #04 — Postponed · Solar · CA · 1.5 MW · 1.4 mi awaySolar Photovoltaic Project #17 — Postponed · Solar · CA · 0.5 MW · 2.0 mi awaySolar Photovoltaic Project #14 — Postponed · Solar · CA · 1.5 MW · 2.0 mi awaySolar Photovoltaic Project #27 — Postponed · Solar · CA · 1 MW · 2.9 mi awaySolar Photovoltaic Project #25 — Postponed · Solar · CA · 4.5 MW · 2.9 mi awaySolar Photovoltaic Project #12 — Postponed · Solar · CA · 0.5 MW · 3.5 mi awaySolar Photovoltaic Project #08 — Postponed · Solar · CA · 0.5 MW · 3.6 mi awaySolar Photovoltaic Project #09 — Postponed · Solar · CA · 0.5 MW · 3.7 mi awayOES Biogas Power — Under construction · Biomass · CA · 2.6 MW · 5.5 mi awayRoadhouse Energy Center — Contracted · Storage · CA · 300 MW · 5.9 mi awaySolar Photovoltaic Project #30 — Postponed · Solar · CA · 1.5 MW · 6.4 mi awayCA Bloomington 2551 S Lilac Avenue Micro — Under construction · Solar + storage · CA · 3 MW · 8.6 mi awaySolar Photovoltaic Project #24 — Postponed · Solar · CA · 4 MW · 9.8 mi awayCA Riverside 2356 Fleetwood Dr. — Under construction · Solar + storage · CA · 4 MW · 10.2 mi awaySolar Photovoltaic Project #28 — Postponed · Solar · CA · 0.5 MW · 11.2 mi awaySunE Redlands — Postponed · Solar · CA · 1.5 MW · 13.4 mi awaySolar Photovoltaic Project #20 — Postponed · Solar · CA · 3.5 MW · 15.0 mi away
  • Wind & solar
  • Storage
  • Bioenergy
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Lugo - Rancho Vista 500 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
500 kV
States crossed
US-CA
Owner (as stated)
Southern California Edison

Details

Who’s behind it

Owner
Southern California Edison

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
28
Substations at the ends (as the source names them)
Lugo to Rancho Vista
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itsouthern california edison
HIFLD line ID313806
Voltage class500 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Solar Photovoltaic Project #23 Postponed Solar 0.9 mi 0.5
Solar Photovoltaic Project #19 Postponed Solar 0.9 mi 5
Solar Photovoltaic Project #18 Postponed Solar 1.0 mi 0.5
Solar Photovoltaic Project #21 Postponed Solar 1.2 mi 2.5
Solar Photovoltaic Project #10 Postponed Solar 1.3 mi 0.5
Solar Photovoltaic Project #31 Postponed Solar 1.4 mi 1
Solar Photovoltaic Project #04 Postponed Solar 1.4 mi 1.5
Solar Photovoltaic Project #17 Postponed Solar 2.0 mi 0.5
Solar Photovoltaic Project #14 Postponed Solar 2.0 mi 1.5
Solar Photovoltaic Project #27 Postponed Solar 2.9 mi 1
Solar Photovoltaic Project #25 Postponed Solar 2.9 mi 4.5
Solar Photovoltaic Project #12 Postponed Solar 3.5 mi 0.5
Solar Photovoltaic Project #08 Postponed Solar 3.6 mi 0.5
Solar Photovoltaic Project #09 Postponed Solar 3.7 mi 0.5
OES Biogas Power Under construction Biomass 5.5 mi 2.6
Roadhouse Energy Center Contracted Storage 5.9 mi 300
Solar Photovoltaic Project #30 Postponed Solar 6.4 mi 1.5
CA Bloomington 2551 S Lilac Avenue Micro Under construction Solar + storage 8.6 mi 3
Solar Photovoltaic Project #24 Postponed Solar 9.8 mi 4
CA Riverside 2356 Fleetwood Dr. Under construction Solar + storage 10.2 mi 4
Solar Photovoltaic Project #28 Postponed Solar 11.2 mi 0.5
SunE Redlands Postponed Solar 13.4 mi 1.5
Solar Photovoltaic Project #20 Postponed Solar 15.0 mi 3.5

Sources EIA-860M · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 18, 2026Source: California ISO

Attribution