Show on map
- Combustion
- Wind & solar
- Storage
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Combustion
- Wind & solar
- Storage
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
Magellan: route and 50 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Magellan
Petroleum product pipeline
Key facts
Petroleum product pipeline Operating- Mapped route length
- Mapped route length: sourceEIA Energy Atlas · Open licensemiles
- States crossed
- US-AR, US-CO, US-IA, US-IL, US-KS, US-MN, US-MO, US-ND, US-NE, US-OK, US-SD, US-TX, US-WI
- Operated by
- Midstream PartnersSourceEIA US Energy Atlas — Petroleum Product Pipelines (line geometries, operator, pipeline name)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 6,828
- Units
- 72
All 5 attributes from EIA US Energy Atlas — Petroleum Product Pipelines (line geometries, operator, pipeline name)
| Attribute | Value |
|---|---|
| Mapped parts | 50 |
| Operator, as the source states it | MIDSTREAM PARTNERS |
| Mapped segments | 72 |
| Source release | 202001 |
| Pipeline name raw | Magellan |
Sources
2 sourcesSources EIA Energy Atlas · EIA US Energy Atlas — Petroleum Product Pipelines (line geometries, operator, pipeline name)
Sources
- EIA US Energy Atlas — Petroleum Product Pipelines (line geometries, operator, pipeline name)Source: U.S. Energy Information Administration, U.S. Energy Atlas, Petroleum Product Pipelines (as of January 2020)
- EIA US Energy Atlas — Petroleum Product Pipelines (line geometries, operator, pipeline name)
Around this pipeline
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Lucky 7 Solar Farm LLC Under construction | Solar | 0.0 km | 101.3 |
| Ponca City Refinery Postponed | Gas, other | 0.0 km | 5 |
| Byers Wind Postponed | Wind | 0.1 km | 200 |
| Pivot Solar 43 LLC Under construction | Solar | 0.1 km | 3.5 |
| Pivot Solar 53 LLC Under construction | Solar | 0.1 km | 4 |
| Co Rd 33 Postponed | Oil | 0.1 km | 5 |
| Steward Creek Solar Phase 1 Announced | Solar | 0.2 km | 1,200 |
| T5 Data Center Northlake Filed | Large load | 0.2 km | |
| Edens Solar Studied | Solar | 0.3 km | 70.8 |
| Copenhagen Ct Under construction | Solar | 0.3 km | 3.5 |
| T5@CHICAGO III LP Built | Large load | 0.3 km | |
| CLOP CAROL STREAM IL LLC Built | Large load | 0.3 km | |
| Grey Fox Wind Postponed | Wind + storage | 0.4 km | 550 |
| Cedar Hill ESS Filed | Storage | 0.4 km | 10 |
| EAGAN 5 MW DATA CENTER Built | Large load | 0.5 km | |
| OPTUM C/O UNITED HEALTH GROUP Built | Large load | 0.5 km | |
| DATA CENTER PARK Built | Large load | 0.6 km | |
| Whistle Solar Studied | Solar | 0.6 km | 56.3 |
| Bright Stalk Wind Farm II Postponed | Wind | 0.6 km | 205.2 |
| Burt County Solar (Sandhills Energy) Under construction | Solar | 0.6 km | 250 |
| Hecate Energy Harley Hand Solar LLC Studied | Solar + storage | 0.6 km | 1,008.9 |
| Jayhawk Postponed | Solar | 0.8 km | 101 |
| Ringe Under construction | Solar | 0.8 km | 2.5 |
| Yellow Cat Wind, LLC Under construction | Wind | 0.8 km | 262 |
| Hannibal Energy Center Announced | Gas, combustion turbine | 0.8 km | 76 |
| Northlake 5-SLCHI305 Under construction | Solar | 0.9 km | 2.5 |
| Solemio LLC Postponed | Solar | 0.9 km | 80 |
| Addison 11-SLCHI404 Under construction | Solar | 0.9 km | 1.6 |
| MICROSOFT CORP-CHICAGO DATA CENTER Built | Large load | 0.9 km | |
| DXC TECHNOLOGY SERVICES LLC / CHEROKEE DATA CENTER Built | Large load | 1.0 km | |
| Apple BESS Under construction | Storage | 1.0 km | 9.9 |
| FIRST DATA RESOURCES INC Built | Large load | 1.1 km | |
| Chimney Rock BESS Studied | Storage | 1.1 km | 156 |
| Glendale Heights 10-SLCHI910 Under construction | Solar | 1.1 km | 1.3 |
| Oystercatcher Solar Built | Solar | 1.3 km | 198.4 |
| Hollow Branch Creek 1 Solar Postponed | Solar | 1.4 km | 460 |
| BP AMOCO / 512 S CINCINNATI AVE SHARED SERVICE CE Built | Large load | 1.4 km | |
| Singing Grass Wind Under construction | Wind | 1.4 km | 603 |
| Erath County Solar Contracted | Solar | 1.5 km | 207.4 |
| Cedar Range Solar Contracted | Solar | 1.5 km | 150.6 |
| SICULUS, INC. Built | Large load | 1.5 km | |
| Northlake 4-SLCHI304 Under construction | Solar | 1.5 km | 1.4 |
| WESTWOOD SOLUTIONS LLC Filed | Large load | 1.5 km | |
| Cass County Permitted | Gas, combustion turbine | 1.6 km | 792 |
| Pine Forest Solar I Built | Solar + storage | 1.6 km | 501.5 |
| WT2 Under construction | Gas, combustion turbine | 1.6 km | 10 |
| Lake Creek Postponed | Coal | 1.7 km | 1,035.5 |
| DC1 Data Center Filed | Large load | 1.7 km | |
| Vial BESS Contracted | Storage | 1.7 km | 135.2 |
| Blue Lake BESS Under construction | Storage | 1.7 km | 135.5 |
Sources ERCOT · EIA-860M · FAA OE/AAA · EPA ICIS-Air · EPA ICIS-NPDES
Sources
- ERCOT GIS Report (Generator Interconnection Status)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- FAA OE/AAA Part 77 obstruction evaluation case archives (data-centre sites, buildings and cranes)
- EPA ECHO ICIS-Air national facility download (data-centre selection, placed through FRS)
- EPA ECHO ICIS-NPDES construction stormwater coverage (data-centre sites, national)