Show on map
- Wind & solar
- Storage
- In development
- Under construction
- Operating
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Storage
- In development
- Under construction
- Operating
Mainland: location and 7 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Mainland
Power plant · Storage
Key facts
Power plant · Storage Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2024
- Net generation, 2025
- -321 MWh
- Grid
- 12 kV to Texas-New Mexico Power Co (ERCO)
- Location
- Galveston County, Texas
- Operated by
- HEN Infrastructure, L.L.C.
Output
Details
Who’s behind it
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Storage source: “Batteries”
- Age
- 2 years since 2024
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 0 |
| Net generation (MWh), 2025 | -321 |
| Balancing authority code | ERCO |
Data notes (1)
- Capacity factor, 2025 not shown: net generation -321.0 MWh is not positive (the plant consumed at least as much as it produced over the year)
Ownership
3 companies4| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| HEN Infrastructure, L.L.C. | Operator | EIA-860M | ||
| John Hancock Funding Company | Owner | 43.4% | 31 Dec 2025 | EIA-860 |
| Manulife Infrastructure II Holdings A, L.P. | Owner | 53.2% | 31 Dec 2025 | EIA-860 |
| HEN Infrastructure, L.L.C. | Owner | 3.4% | 31 Dec 2025 | EIA-860 |
Timeline
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Vertus Energy Storage Plant Studied | Storage | 0.3 km | 204.9 |
| Red Egret Under construction | Storage | 4.6 km | 310.6 |
| Zeya Under construction | Storage | 9.0 km | 255.3 |
| Hidden Lakes Postponed | Storage | 10.8 km | 9.9 |
| Berkman Storage Postponed | Storage | 12.4 km | 100 |
| Willow Beach Wind Contracted | Wind | 18.6 km | 202.3 |
| Bocanova Energy Storage II Under construction | Storage | 20.9 km | 150 |