Show on map
- Wind & solar
- Storage
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Storage
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
Manchester - Kleen 345 kV: route and 12 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Manchester - Kleen 345 kV
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 345 kV
- States crossed
- US-CT
- Owner (as stated)
- Connecticut Light Power
Details
Who’s behind it
- Owner
- Connecticut Light Power
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 17
- Substations at the ends (as the source names them)
- Manchester to Kleen
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| Owner, as the source states it | connecticut light power |
| HIFLD line ID | 121834 |
| Voltage class | 345 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Elevate Middletown Announced | Storage | 0.8 mi | 275 |
| Middletown Solar Two Postponed | Solar | 3.3 mi | 1.9 |
| Middletown Solar One Postponed | Solar | 3.5 mi | 2 |
| NU - WETHERSFIELD DATA CENTER Built | Large load | 5.9 mi | |
| Hartford Hospital Cogeneration Postponed | Gas, combustion turbine | 6.0 mi | 11.5 |
| Homestead Fuel Cell Postponed | Gas, other | 7.6 mi | 8.4 |
| Ellington Solar One Postponed | Solar | 8.5 mi | 2 |
| Moodus Solar One Postponed | Solar | 9.2 mi | 2 |
| Meriden Solar One Postponed | Solar | 11.4 mi | 1 |
| CT Airport Authority Solar One Announced | Solar | 12.7 mi | 4 |
| Windsor Locks Under construction | Solar | 12.7 mi | 1.8 |
| Dollar Tree Solar One Postponed | Solar | 12.9 mi | 2 |
Sources EIA-860M · EPA ICIS-Air