Show on map
Mckeever — Power plant · Oil · Power Depot Group A, LLCCrowned Heron 2 - Storage, LLC — Storage · TX · 154.2 MW · 13.9 km awayJack Fusco Energy Center — Gas, combined cycle · TX · 400 MW · 14.6 km awayCallisto II Energy Center — Storage · TX · 303.2 MW · 15.5 km awayPamela Heights I Energy Center — Storage · TX · 101.7 MW · 15.5 km awayTX17 Nickel Prairie Storage — Storage · TX · 100 MW · 17.9 km awayImperial Power Plant LLC — Gas, reciprocating engine · TX · 12 MW · 21.3 km awayBocanova Energy Storage II — Storage · TX · 150 MW · 23.5 km awayRock N' Roll — Solar + storage · TX · 358 MW · 23.9 km awayCradle Solar — Solar · TX · 225 MW · 24.2 km away
  • Combustion
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Oil

Key facts

Power plant · Oilran 0% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2013
Net generation, 2025
80 MWh
Grid
138 kV to CenterPoint Energy (ERCO)
Location
Fort Bend County, Texas
Operated by
Power Depot Group A, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2022 to 2025
Fuel burned MMBtu by year, 2022 to 2025
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
13 years since 2013
Unused energy
79 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
10,188 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
138
Transmission owner
CenterPoint Energy
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 2025815
Capacity factor, 20250.001
Heat rate (Btu/kWh), 202510,187.5
Net generation (MWh), 202580
Balancing authority codeERCO

Timeline

  • In service · EIA-860M

Sources

3 sources

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Crowned Heron 2 - Storage, LLC Built Storage 13.9 km 154.2
Jack Fusco Energy Center Postponed Gas, combined cycle 14.6 km 400
Callisto II Energy Center Under construction Storage 15.5 km 303.2
Pamela Heights I Energy Center Under construction Storage 15.5 km 101.7
TX17 Nickel Prairie Storage Postponed Storage 17.9 km 100
Imperial Power Plant LLC Postponed Gas, reciprocating engine 21.3 km 12
Bocanova Energy Storage II Under construction Storage 23.5 km 150
Rock N' Roll Studied Solar + storage 23.9 km 358
Cradle Solar Postponed Solar 24.2 km 225

Sources EIA-860M · ERCOT

Sources

Attribution