Show on map
Medoc — Power plant · Storage · North Carolina El Member CorpHalifax County Solar — Solar · NC · 80 MW · 14.5 km awaySweetleaf Solar LLC — Solar · NC · 93 MW · 14.8 km awayEnfield Farm — Solar · NC · 5 MW · 16.6 km awayHalifax Solar LLC — Solar · NC · 5 MW · 22.5 km awayCarter Solar — Solar · NC · 5 MW · 22.8 km away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Storage

Key facts

Power plant · Storage Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2024
Net generation, 2025
-207 MWh
Grid
12 kV to Virginia Electric & Power Co (PJM)
Location
Halifax County, North Carolina
Operated by
North Carolina El Member CorpSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2024 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Storage source: “Batteries”
Age
2 years since 2024
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
12.50
Transmission owner
Virginia Electric & Power Co
Balancing authority code
PJM
Balancing authority name
PJM Interconnection, LLC
Fuel burned (MMBtu), 20250
Net generation (MWh), 2025-207
Balancing authority codePJM
Data notes (1)
  • Capacity factor, 2025 not shown: net generation -207.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Timeline

  • In service · EIA-860M

Sources

3 sources

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Halifax County Solar Under construction Solar 14.5 km 80
Sweetleaf Solar LLC Permitted Solar 14.8 km 93
Enfield Farm Postponed Solar 16.6 km 5
Halifax Solar LLC Postponed Solar 22.5 km 5
Carter Solar Postponed Solar 22.8 km 5

Sources EIA-860M

Sources

Attribution