Memphis Hardwood Flooring — Power plant · Biomass · Cascades Tissue GroupCOLOSSUS DATA CENTER — Built · Large load · TN · 10.8 mi away5C MEM01 INC — Built · Large load · TN · 12.0 mi awayOPPIDAN DATA CENTER — Built · Large load · TN · 13.1 mi away330T - Gun Range Datacenter — Filed · Large load · MS · 14.1 mi away
  • Bioenergy
  • Loads
  • In development
  • Operating
  • Retired
  • Size not stated
  • 10 · 100 · 1,000 MW

Memphis Hardwood Flooring

Power plant · Biomass

Key facts

Power plant · Biomass Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1956
Net generation, 2007
0 MWh
Location
Shelby County, Tennessee
Operated by
Cascades Tissue GroupSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2007
Fuel burned MMBtu by year, 2001 to 2007
  • Biomass and waste

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Biomass source: “Wood/Wood Waste Biomass”
Age
70 years since 1956

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
March 2007
Capacity retired
2.2 MW
Generators retired
2
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
MEM1Wood/Wood Waste Biomass1.2 MWRetiredMarch 2007
MEM2Wood/Wood Waste Biomass1 MWRetiredMarch 2007

Grid

Not in EIA-860Grid fieldsEIA-860 states no grid voltage or transmission owner for this plant: its annual file lists plants with a generator in the report year, so a plant that retired earlier is not in it.
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units MEM1, MEM2 scheduled to retire, 2.2 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
COLOSSUS DATA CENTER Built Large load 10.8 mi
5C MEM01 INC Built Large load 12.0 mi
OPPIDAN DATA CENTER Built Large load 13.1 mi
330T - Gun Range Datacenter Filed Large load 14.1 mi