Show on map
Miami Fort — Power plant · Coal · Luminant Miami FortCYRUS ONE LLC — Large load · KY · 22.3 km awayCYRUSONE LLC - FLORENCE DATA CENTER — Large load · KY · 22.3 km away
  • Combustion
  • Loads
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Coal

Key facts

Power plant · Coalran 65% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1971
Net generation, 2025
6,716,243 MWh
Grid
345 kV to Duke Energy Ohio Inc (PJM)
Location
Hamilton County, Ohio

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Coal
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Coal source: “Conventional Steam Coal”
Age
55 years since 1971
Unused energy
3,628 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
10,530 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Parents
Name
Vistra Corp
Share pct
100
Gem entity id
E100000001322
Name
Duke Energy Corp
Share pct
100
Gem entity id
E100000001194
Unit ids
G100000106902, G100000106903, G100000106904, G100000114580
Location id
L100000104113
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110000823379
Subparts reported
C, D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1000841
Fuel burned (MMBtu), 202570,725,351
Capacity factor, 20250.649
Heat rate (Btu/kWh), 202510,530.5
Net generation (MWh), 20256,716,243.0
Balancing authority codePJM

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
263.2 MW
Generators retired
2
Capacity still in service
1,180.8 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
5Conventional Steam Coal100 MWRetiredJanuary 2008
6Conventional Steam Coal163.2 MWRetiredJune 2015

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
345 kV
Transmission or distribution system owner
Duke Energy Ohio Inc
Balancing authority
PJM Interconnection, LLC
NERC region
RFC
Transmission lines within 25 km (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

3 companies3
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Luminant Miami Fort Operator EIA-860M
Vistra Corp Owner 100.0% 31 Dec 2023 EPA GHGRP
Duke Energy Ohio Inc Owner 31 Dec 2025 EIA-860

Timeline

  • Stated Unit 6 scheduled to retire, 163.2 MW · EIA-860M
  • Stated Unit 5 scheduled to retire, 100 MW · EIA-860M
  • In service · EIA-860M

Sources

7 sources

Sources EIA-860M · GEM · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
CYRUS ONE LLC Built Large load 22.3 km
CYRUSONE LLC - FLORENCE DATA CENTER Built Large load 22.3 km