Show on map
Mifflinburg PA BTM — Power plant · Oil · American Mun Power-Ohio, IncFranklin White Church Road Solar LLC — Under construction · Solar · PA · 3 MW · 9.3 mi awayPerry Route 104 Solar LLC — Under construction · Solar · PA · 3 MW · 12.0 mi awayNorthumberland Solar — Postponed · Storage · PA · 20 MW · 12.2 mi awayBeaver Gross Road Solar LLC — Permitted · Solar · PA · 3 MW · 13.6 mi away
  • Combustion
  • Wind & solar
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Mifflinburg PA BTM

Power plant · Oil

Key facts

Power plant · Oilran 1% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2024
Net generation, 2025
277 MWh
Grid
12 kV to Borough of Mifflinburg - (PA) (PJM)
Location
Union County, Pennsylvania
Operated by
American Mun Power-Ohio, IncSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2024 to 2025
Fuel burned MMBtu by year, 2024 to 2025
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
2 years since 2024
Unused energy
47 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
9,025 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
RFC
Report year
2025
Grid voltage kv
12.50
Transmission owner
Borough of Mifflinburg - (PA)
Balancing authority code
PJM
Balancing authority name
PJM Interconnection, LLC
Fuel burned (MMBtu), 20252,500
Capacity factor, 20250.006
Heat rate (Btu/kWh), 20259,025.3
Net generation (MWh), 2025277
Balancing authority codePJM

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Franklin White Church Road Solar LLC Under construction Solar 9.3 mi 3
Perry Route 104 Solar LLC Under construction Solar 12.0 mi 3
Northumberland Solar Postponed Storage 12.2 mi 20
Beaver Gross Road Solar LLC Permitted Solar 13.6 mi 3

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution