Show on map
- Combustion
- Clean firm
- Wind & solar
- Loads
- In development
- Under construction
- Operating
- Stage not stated
- Size not stated
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Combustion
- Clean firm
- Wind & solar
- Loads
- In development
- Under construction
- Operating
- Stage not stated
- Size not stated
- Other infrastructure
Mississippi Valley Gas Co: route and 17 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Mississippi Valley Gas Co
Gas pipeline · intrastate
Key facts
Gas pipeline · intrastate Operating- Mapped route length
- Mapped route length: sourceEIA Energy Atlas · Open licensemiles
- Class
- intrastate
- States crossed
- US-MS
- Operated by
- Mississippi Valley Gas CoSourceEIA US Energy Atlas — Natural Gas Interstate and Intrastate Pipelines (line geometries)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Pipeline class
- intrastate
- Mapped route length (miles)
- 560
- Technology
- Intrastate source: “Intrastate”
- Units
- 150
All 4 attributes from EIA US Energy Atlas — Natural Gas Interstate and Intrastate Pipelines (line geometries)
| Attribute | Value |
|---|---|
| Mapped parts | 89 |
| Status, as the source states it | Operating |
| Mapped segments | 150 |
| Source release | 202001 |
Sources
2 sourcesAround this pipeline
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Delta Solar Plant Announced | Solar | 0.0 mi | 80 |
| Landshark Energy Generation Facility Announced | Solar | 0.5 mi | 160 |
| Traceview Advanced Power Station Under construction | Gas, combined cycle | 2.0 mi | 819.4 |
| JACKSON DATA CENTER Unknown | Large load | 3.2 mi | |
| Grenada Lake Hydroelectric Project Announced | Hydro | 3.5 mi | 10 |
| 5C MEM01 INC Built | Large load | 4.1 mi | |
| 330T - Gun Range Datacenter Filed | Large load | 4.8 mi | |
| OPPIDAN DATA CENTER Built | Large load | 5.0 mi | |
| AMAZON DATA SERVICES INC, MADISON MEGA SITE Built | Large load | 5.1 mi | |
| Hinds Solar, LLC Under construction | Solar | 7.1 mi | 150 |
| SR Magnolia Under construction | Solar | 7.9 mi | 160 |
| Delta Blues Advanced Power Station Filed | Gas, combined cycle | 8.1 mi | 818.7 |
| Girasol Solar Farm Announced | Solar | 8.8 mi | 100 |
| Tom Bevill Lock and Dam Hydroelectric Postponed | Hydro | 10.9 mi | 12 |
| SR West Helena Permitted | Solar | 11.3 mi | 4.8 |
| New Caledonia Announced | Gas, combustion turbine | 12.3 mi | 504 |
| COLOSSUS DATA CENTER Built | Large load | 12.7 mi |
Sources EIA-860M · EPA ICIS-NPDES · EPA ICIS-Air · FAA OE/AAA · Epoch AI
Sources
- EIA-860M
- EPA ICIS-NPDES
- EPA ICIS-Air
- FAA OE/AAA
- Epoch AIEpoch AI, AI data centers (Frontier Data Centers hub), CC BY 4.0, https://epoch.ai/data/ai-data-centers. Modified by Inframation: selected rows and columns only; figures are Epoch AI's estimates and are shown as such; names and statuses mapped to Inframation's vocabulary.