Show on map
Mohea Solar Energy Center, LLC — Power plant · Solar · SunStrong Management, LLCInnovative Solar 33 — Postponed · Solar · NC · 30.5 MW · 9.4 mi awayHigh Pockets Solar — Postponed · Solar · NC · 1.9 MW · 10.3 mi awayJames E. Rogers Energy Complex — Postponed · Coal · NC · 800 MW · 11.9 mi awayCleveland Cnty Generating Facility — Postponed · Gas, combustion turbine · NC · 736 MW · 13.0 mi awayBradley Farm — Postponed · Solar · NC · 5 MW · 13.4 mi awayShadow Solar — Postponed · Solar · NC · 3 MW · 14.6 mi away
  • Wind & solar
  • Operating
  • 10 · 100 · 1,000 MW

Mohea Solar Energy Center, LLC

Power plant · Solar

Key facts

Power plant · Solarran 19% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2020
Net generation, 2025
8,496 MWh
Grid
12 kV to Duke Energy Carolinas, LLC (DUK)
Location
Cherokee County, South Carolina
Operated by
SunStrong Management, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2020 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
6 years since 2020
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000816794
Location id
L100000814041
Eia plant ids
63463
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
12.50
Transmission owner
Duke Energy Carolinas, LLC
Balancing authority code
DUK
Balancing authority name
Duke Energy Carolinas
Fuel burned (MMBtu), 202528,989
Capacity factor, 20250.194
Net generation (MWh), 20258,496
Balancing authority codeDUK

Solar arrays

Array area (acres)
15.8
AC capacity (MW)
5
DC capacity (MW)
6.2
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2020

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Innovative Solar 33 Postponed Solar 9.4 mi 30.5
High Pockets Solar Postponed Solar 10.3 mi 1.9
James E. Rogers Energy Complex Postponed Coal 11.9 mi 800
Cleveland Cnty Generating Facility Postponed Gas, combustion turbine 13.0 mi 736
Bradley Farm Postponed Solar 13.4 mi 5
Shadow Solar Postponed Solar 14.6 mi 3

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution