Monroe (MI): location and 1 exact-grade project within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Monroe (MI)
Power plant · Coal
Key facts
Power plant · Coalran 57% of 2025 Retiring- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1969
- Net generation, 2025
- 16,375,218 MWh
- Grid
- 345 kV to ITC Transmission (MISO)
- Location
- Monroe County, Michigan
- Operated by
- DTE Electric Company
Output
- Coal
- Oil
Details
Who’s behind it
- Owner
- DTE Energy CO
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Coal source: “Conventional Steam Coal”
- Age
- 57 years since 1969
- Heat rate
- 9,969 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| EPA greenhouse gas reporting (GHGRP) |
|
| Fuel burned (MMBtu), 2025 | 163,240,827 |
| Capacity factor, 2025 | 0.568 |
| Heat rate (Btu/kWh), 2025 | 9,968.8 |
| Net generation (MWh), 2025 | 16,375,217.5 |
| Balancing authority code | MISO |
Retirement
EIA-860M September 2026StatusAt least half of the plant's in-service nameplate capacity is scheduled to retire, on dates its owner has reported to EIA. As of EIA-860M for September 2026.- Next scheduled retirement
- December 2028
- Last scheduled retirement
- December 2032
- Capacity scheduled to retire
- 3,279.6 MW
- Generators scheduled to retire
- 4
- Share of in-service capacity scheduled
- 100%
- Capacity still in service
- 3,293.1 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 3 | Conventional Steam Coal | 822.6 MW | Scheduled to retire | December 2028 |
| 4 | Conventional Steam Coal | 817.2 MW | Scheduled to retire | December 2028 |
| 1 | Conventional Steam Coal | 817.2 MW | Scheduled to retire | December 2032 |
| 2 | Conventional Steam Coal | 822.6 MW | Scheduled to retire | December 2032 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 345 kV
- Transmission or distribution system owner
- ITC Transmission
- Balancing authority
- Midcontinent Independent Transmission System Operator, Inc..
- NERC region
- RFC
Transmission lines within 15 mi (10)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| DTE Electric Company | Operator | EIA-860M | ||
| DTE ENERGY CO | Owner | 100.0% | Dec 31, 2023 | EPA GHGRP |
Timeline
- Stated Units 1, 2 scheduled to retire, 1,639.8 MW · EIA-860M
- Stated Units 3, 4 scheduled to retire, 1,639.8 MW · EIA-860M
- In service · EIA-860M
Sources
6 sourcesSources EIA-860M · GEM · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Strasburg Solar Park Under construction | Solar | 8.1 mi | 100 |
Sources EIA-860M