Show on map
Monroe (MI) — Power plant · Coal · DTE Electric CompanyStrasburg Solar Park — Under construction · Solar · MI · 100 MW · 8.1 mi away
  • Combustion
  • Wind & solar
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Monroe (MI)

Power plant · Coal

Key facts

Power plant · Coalran 57% of 2025 Retiring
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1969
Net generation, 2025
16,375,218 MWh
Grid
345 kV to ITC Transmission (MISO)
Location
Monroe County, Michigan

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Coal
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Coal source: “Conventional Steam Coal”
Age
57 years since 1969
Heat rate
9,969 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Parents
Name
DTE Energy Co
Share pct
100
Gem entity id
E100002004748
Unit ids
G100000106997, G100000106998, G100000106999, G100000107000
Location id
L100000103985
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110000405927
Subparts reported
C, D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1000676
Fuel burned (MMBtu), 2025163,240,827
Capacity factor, 20250.568
Heat rate (Btu/kWh), 20259,968.8
Net generation (MWh), 202516,375,217.5
Balancing authority codeMISO

Retirement

EIA-860M September 2026StatusAt least half of the plant's in-service nameplate capacity is scheduled to retire, on dates its owner has reported to EIA. As of EIA-860M for September 2026.
Next scheduled retirement
December 2028
Last scheduled retirement
December 2032
Capacity scheduled to retire
3,279.6 MW
Generators scheduled to retire
4
Share of in-service capacity scheduled
100%
Capacity still in service
3,293.1 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
3Conventional Steam Coal822.6 MWScheduled to retireDecember 2028
4Conventional Steam Coal817.2 MWScheduled to retireDecember 2028
1Conventional Steam Coal817.2 MWScheduled to retireDecember 2032
2Conventional Steam Coal822.6 MWScheduled to retireDecember 2032

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
345 kV
Transmission or distribution system owner
ITC Transmission
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
RFC
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
DTE Electric Company Operator EIA-860M
DTE ENERGY CO Owner 100.0% Dec 31, 2023 EPA GHGRP

Timeline

  • Stated Units 1, 2 scheduled to retire, 1,639.8 MW · EIA-860M
  • Stated Units 3, 4 scheduled to retire, 1,639.8 MW · EIA-860M
  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • LBNLOpen license, with credit · retrieved Nov 9, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory
  • EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Strasburg Solar Park Under construction Solar 8.1 mi 100

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution