Monterey Regional Water Pollution Contro — Power plant · Solar · Tesla Inc.Marina Landfill Gas — Announced · Biomass · CA · 6.4 MW · 1.2 mi awayCA Moss Landing 3040 Hilltop Rd — Postponed · Solar + storage · CA · 2.2 MW · 10.0 mi awayCrazy Horse Solar Project — Postponed · Solar · CA · 2 MW · 10.9 mi away
  • Wind & solar
  • Bioenergy
  • In development
  • Operating
  • 10 · 100 · 1,000 MW

Monterey Regional Water Pollution Contro

Power plant · Solar

Key facts

Power plant · Solarran 13% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2010
Net generation, 2025
1,149 MWh
Grid
0.5 kV to Pacific Gas & Electric Co (CISO)
Location
Monterey County, California
Operated by
Tesla Inc.

Output

Net generation MWh by year, 2013 to 2025

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
16 years since 2010
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000816813
Location id
L100000814056
Eia plant ids
58633
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
0.500
Transmission owner
Pacific Gas & Electric Co
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Fuel burned (MMBtu), 20253,919
Capacity factor, 20250.131
Net generation (MWh), 20251,149
Balancing authority codeCISO

Solar array

Array area (acres)
6
AC capacity (MW)
1
DC capacity (MW)
1.1
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2010

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Tesla Inc. Operator EIA-860M
Banyan SolarCity Owner 2010 LLC Owner 100.0% Dec 31, 2025 EIA-860

Timeline

  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory
  • EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Marina Landfill Gas Announced Biomass 1.2 mi 6.4
CA Moss Landing 3040 Hilltop Rd Postponed Solar + storage 10.0 mi 2.2
Crazy Horse Solar Project Postponed Solar 10.9 mi 2

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution