Montgomery County Oaks LFGE Plant: location and 7 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Montgomery County Oaks LFGE Plant
Power plant · Biomass
Output
- Biomass and waste
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
- Technology
- Biomass source: “Landfill Gas”
- Age
- 17 years since 2009
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Balancing authority code | PJM |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- July 2021
- Capacity retired
- 2.4 MW
- Generators retired
- 2
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| CAT35 | Landfill Gas | 1.6 MW | Retired | July 2021 |
| GEJGC | Landfill Gas | 0.8 MW | Retired | July 2021 |
Grid
EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).- Balancing authority
- PJM
Transmission lines within 15 mi (10)
- Quince Orchard - Mount Zion 230 kV
- Quince Orchard - Mount Zion 230 kV
- Quince Orchard - Mount Zion 230 kV
- Mount Zion - Norbeck 230 kV
- Mount Zion - Norbeck 230 kV
- Mount Zion - Norbeck 230 kV
- Brighton - Mount Zion 230 kV
- Brighton 500 kV line
- Brighton - Waugh Chapel 500 kV
- Brighton - Burtonsville 230 kV
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Units CAT35, GEJGC scheduled to retire, 2.4 MW · EIA-860M
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Montgomery County Oaks LFGE Plant Postponed | Biomass | 0.0 mi | 5.6 |
| GENERAL ELECTRIC, ROCKVILLE Built | Large load | 7.4 mi | |
| GE INFORMATION SYSTEMS Built | Large load | 8.3 mi | |
| ADP OF WASHINGTON Built | Large load | 10.0 mi | |
| VERIZON FAIRLAND DATA CENTER Built | Large load | 12.1 mi | |
| PROSPERITY DRIVE DATA CENTER, LLC Built | Large load | 12.4 mi | |
| GANNETT COMPANY Built | Large load | 12.6 mi |
Sources EIA-860M · EPA ICIS-Air