Show on map
Murphy-Brown LLC — Power plant · Oil · Murphy - Brown LLCWarsaw 2 Energy Storage — Under construction · Storage · NC · 11 MW · 2.5 mi awayAngus Holdings — Postponed · Solar · NC · 5 MW · 3.6 mi awayHolger Holdings — Postponed · Solar · NC · 5 MW · 8.0 mi awayFibroCoast — Postponed · Biomass · NC · 60 MW · 9.0 mi awayFaison Farm — Postponed · Solar · NC · 5 MW · 9.1 mi awayPanther Branch Solar, LLC — Filed · Solar + storage · NC · 112 MW · 10.4 mi awayCalypso Farm — Postponed · Solar · NC · 5 MW · 11.2 mi awayInnovative Solar 38 — Postponed · Solar · NC · 34 MW · 14.3 mi away
  • Combustion
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Murphy-Brown LLC

Power plant · Oil

Key facts

Power plant · Oilran 0% of 2025 Standby
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1995
Net generation, 2025
3 MWh
Grid
0.5 kV to Four County Elec Member Corp (CPLE)
Location
Duplin County, North Carolina
Operated by
Murphy - Brown LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
31 years since 1995
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
0.500
Transmission owner
Four County Elec Member Corp
Balancing authority code
CPLE
Balancing authority name
Duke Energy Progress East
Eia status
By code
SB
Mw
2.40
Units
2
Standby mw
2.40
Status rule
majority_mw_standby
In service mw
2.40
Out of service mw
0
Fuel burned (MMBtu), 2025123
Capacity factor, 20250.000
Net generation (MWh), 20253
Balancing authority codeCPLE
Data notes (1)
  • Heat rate (Btu/kWh), 2025 not shown: computed 41000.0 outside 5000-30000 Btu/kWh

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Warsaw 2 Energy Storage Under construction Storage 2.5 mi 11
Angus Holdings Postponed Solar 3.6 mi 5
Holger Holdings Postponed Solar 8.0 mi 5
FibroCoast Postponed Biomass 9.0 mi 60
Faison Farm Postponed Solar 9.1 mi 5
Panther Branch Solar, LLC Filed Solar + storage 10.4 mi 112
Calypso Farm Postponed Solar 11.2 mi 5
Innovative Solar 38 Postponed Solar 14.3 mi 34

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution