Show on map
- Combustion
- Wind & solar
- Storage
- In development
- Under construction
- Operating
- 10 · 100 · 1,000 MW
Map
- Combustion
- Wind & solar
- Storage
- In development
- Under construction
- Operating
Murphy-Brown LLC: location and 8 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Murphy-Brown LLC
Power plant · Oil
Key facts
Power plant · Oilran 0% of 2025 Standby- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1995
- Net generation, 2025
- 3 MWh
- Grid
- 0.5 kV to Four County Elec Member Corp (CPLE)
- Location
- Duplin County, North Carolina
- Operated by
- Murphy - Brown LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Oil
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Oil source: “Petroleum Liquids”
- Age
- 31 years since 1995
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Grid |
|
| Eia status |
|
| Fuel burned (MMBtu), 2025 | 123 |
| Capacity factor, 2025 | 0.000 |
| Net generation (MWh), 2025 | 3 |
| Balancing authority code | CPLE |
Data notes (1)
- Heat rate (Btu/kWh), 2025 not shown: computed 41000.0 outside 5000-30000 Btu/kWh
Timeline
- In service · EIA-860M
Sources
3 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Warsaw 2 Energy Storage Under construction | Storage | 2.5 mi | 11 |
| Angus Holdings Postponed | Solar | 3.6 mi | 5 |
| Holger Holdings Postponed | Solar | 8.0 mi | 5 |
| FibroCoast Postponed | Biomass | 9.0 mi | 60 |
| Faison Farm Postponed | Solar | 9.1 mi | 5 |
| Panther Branch Solar, LLC Filed | Solar + storage | 10.4 mi | 112 |
| Calypso Farm Postponed | Solar | 11.2 mi | 5 |
| Innovative Solar 38 Postponed | Solar | 14.3 mi | 34 |
Sources EIA-860M