Mustang Two
Power plant · Solar
Key facts
Power plant · Solarran 30% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2020
- Net generation, 2025
- 396,295 MWh
- Grid
- 230 kV to Pacific Gas & Electric Co. (CISO)
- Location
- Kings County, California
- Operated by
- RE Mustang Two LLC
Output
Details
Who’s behind it
- Owner
- Idemitsu Renewables
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Solar source: “Solar Photovoltaic”
- Age
- 6 years since 2020
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 1,352,158 |
| Capacity factor, 2025 | 0.302 |
| Net generation (MWh), 2025 | 396,295 |
| Balancing authority code | CISO |
Solar arrays
Solar arrays
The array area counts panels and inverters only, not buildings, fences or the whole site.
- Array area (acres)
- 1,075.8
- AC capacity (MW)
- 150
- DC capacity (MW)
- 211
- Mounting
- Single-axis tracking
- Site type
- Previous, current or suspected contamination
- Began operating
- 2020
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| RE Mustang Two LLC | Operator | EIA-860M | ||
| Idemitsu Renewables | Owner | 100.0% | Dec 31, 2025 | EIA-860 |
Timeline
- In service · EIA-860M
Sources
6 sourcesSources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- USPVDBMap services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Grape Under construction | Solar | 4.9 mi | 246.4 |
| Cherry Permitted | Solar + storage | 6.7 mi | 359.7 |
| Sand Luis West Permitted | Solar + storage | 9.4 mi | 156.3 |
| Key Energy Storage Under construction | Storage | 14.2 mi | 300.1 |