Mustang Two — Power plant · Solar · RE Mustang Two LLCCentral 40 — Power plant · Solar · Central 40, LLCSF Azalea, LLC — Power plant · Solar · Idemitsu RenewablesChalan — Solar + storage · CA · 64.9 MW · 2.1 km awayGardenia 1 — Solar + storage · CA · 6 MW · 3.0 km awayPistachio Road 1726-WD — Solar · CA · 4.8 MW · 6.6 km awayGrape — Solar · CA · 246.4 MW · 7.9 km awayCherry — Solar + storage · CA · 359.7 MW · 10.8 km awayPelicans Jaw Hybrid Solar — Solar + storage · CA · 678.5 MW · 13.6 km awaySand Luis West — Solar + storage · CA · 156.3 MW · 15.2 km awayGonzaga Ridge Wind Farm — Wind · CA · 34.6 MW · 20.2 km awayGonzaga Ridge Wind Farm — Wind · CA · 40.3 MW · 20.2 km awayGonzaga Ridge Wind Farm — Wind · CA · 57.9 MW · 20.2 km awayGonzaga Ridge Battery Facility — Storage · CA · 51.8 MW · 21.5 km awayKey Energy Storage — Storage · CA · 300.1 MW · 22.9 km awayChevron - Lost Hills Hybrid — Storage · CA · 10 MW · 24.7 km away
  • Wind & solar
  • Operating
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Idemitsu Renewables

Follow this company

Independent power producer

Key facts

Independent power producer · 288 MW
Assets
3
States
CA
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,119 of 50,272 companies here. Why

Gross output of plants with a stake

3 of 3 plantsOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 3 of 3 plants with a stake: US plants with an EIA monthly series.100% of the output is from 3 plants recorded as wholly owned.1 plant: operator, wholly owned per EIA-860.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.

Gross output of plants with a stake MWh by month, 2020 to 2026
  • Solar
Yearly totals
Gross net generation of the plants with a stake, MWh by year and generation group, newest first.
YearSolarTotal (MWh)
2026 (part year)265,700265,700
2025465,809465,809
2024452,652452,652
2023451,431451,431
2022447,107447,107
2021489,131489,131
2020 (part year)41,99441,994

Sources EIA-860 · EIA-860M · EIA

Sources

Attribution

Assets 3

Assets

3

Capacity

288 MW

MW by fuel
  1. Solar: 288 MW, 3 assets

Operates 1 power plant · Owns 2 power plants

Assets this company owns or operates, sorted by capacity, largest first.
Name. Sort by name, A to Z Type. Sort by type, A to Z Role. Sort by role, A to Z MW, sorted descending. Sort by capacity, smallest first State. Sort by state, A to Z Share Held by
Mustang Two Solar Owns 150 MW US-CA 100.0% Idemitsu Renewables
SF Azalea, LLC Solar Operates 98 MW US-CA — Idemitsu Renewables
Central 40 Solar Owns 40 MW US-CA 100.0% Idemitsu Renewables

Sources EIA-860M · GEM

Sources

Every source and license · Attribution

Around this company

Nearby 13

within 25 km

Projects

13

within 25 km

Nearest

2.1 km

Chalan

All 13NearbyShowing all 13 nearby projects. They fill 11 rows, as a project's generator units share a row.

How these are matched

Exact-grade projects within 25 km of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 25 km of this company’s assets, sorted by distance, nearest first: 11 rows for the nearest of 13.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Under construction Chalan Solar + storage 64.9 MW 2.1 km away nearest: SF Azalea, LLC
Announced Gardenia 1 Solar + storage 6 MW 3.0 km away nearest: SF Azalea, LLC
Under construction Pistachio Road 1726-WD Solar 4.8 MW 6.6 km away nearest: SF Azalea, LLC
Under construction Grape Solar 246.4 MW 7.9 km away nearest: Mustang Two
Permitted Cherry Solar + storage 359.7 MW 10.8 km away nearest: Mustang Two
Under construction Pelicans Jaw Hybrid Solar Solar + storage 678.5 MW 13.6 km away nearest: SF Azalea, LLC
Permitted Sand Luis West Solar + storage 156.3 MW 15.2 km away nearest: Mustang Two
Under construction Gonzaga Ridge Wind Farm × 3 units Wind 132.8 MW 20.2 km away nearest: Central 40
Under construction Gonzaga Ridge Battery Facility Storage 51.8 MW 21.5 km away nearest: Central 40
Under construction Key Energy Storage Storage 300.1 MW 22.9 km away nearest: Mustang Two
Postponed Chevron - Lost Hills Hybrid Storage 10 MW 24.7 km away nearest: SF Azalea, LLC

Sources CAISO · EIA-860M